Gahcho Kué diamond project, Canada
Name and Location
Gahcho Kué diamond project, Northwest Territories (NWT), Canada.
Client
Gahcho Kué Joint Venture (JV) – a collaboration between De Beers Canada (51%) and Mountain Province Diamonds (49%).
Project Description
Gahcho Kué, which is Chipewyan for ‘a place where big rabbits are found’, is located at Kennady Lake, 280 km north-east of Yellowknife, and 80 km east of De Beers’ existing Snap Lake mine, in NWT. The diamond prospect is one of the largest new diamond projects under development globally.
The project consists of the Hearne North and South; the 5034 West pipe, the Central and North-East pipes; the 5034 South pipe; the 5034 North pipe; Wallace; and the Dunn Sheet, Tuzo and Tesla diamondiferous kimberlite pipes, sheets and dykes.
Gahcho Kué consists of a cluster of kimberlites, three of which have a probable mineral reserve of about 31.3-million tonnes, grading at 1.57 ct/t (about 49-million carats).
The project will have an estimated production rate of three-million tonnes of ore a year and 4.5-million carats a year.
The project design is based on the openpit mining of the 5034, Hearne and Tuzo deposits in a sequential fashion.
Mine plans call for the extraction of 233.7-million tonnes of waste and 31.3-million tonnes of ore over 11 years, using standard drill/blast and truck/shovel equipment and pit designs, which are similar to those of other openpit diamond mines operating in the area.
Ore will be fed to a three-million-tonne-a-year processing plant, with three stages of crushing, dense-medium separation, and X-ray/grease diamond recovery circuits.
Supporting infrastructure includes a 14.1 MW packaged diesel power plant, a 1 350 m gravel airstrip, a five-bay truck shop, an emulsion plant, a 40-million-litre fuel storage facility and a 432-bed accommodation/office complex.
Value
An estimated capital cost of C$600-million.
Duration
The start of production is targeted for 2014.
Latest Developments
The Mackenzie Valley Environmental Impact Review Board has approved the proposed 4.5-million-carat diamond mine, subject to measures and follow-up programmes.
The ‘Environmental Impact Review and Reasons for Decision’ report for the Gahcho Kué project, released on July 19, found that the project was likely to cause “significant adverse environmental impacts” and the panel set out measures required to mitigate such impacts.
This included reducing the impacts of the mine site and winter access road on caribou and its habitat, as well as reducing the project’s impact on the cumulative potential effects on the caribou population.
The panel called for follow-up programmes to address the impacts on water, fish, caribou, other wildlife and species at risk, as well as on socioeconomic components.
The JV partners are reviewing the report to better understand the implications of the measures and follow-up programme as recommended by panel, adding that they are eager to proceed to the next stages in the regulatory approval process.
The project entails dewatering portions of Kennady Lake to access the three openpits, then backfilling one openpit and portions of a second openpit with waste rock and processed waste material from the mill, before refilling Kennady Lake at the end of the mine life and allowing fish to repopulate the lake.
The Gahcho Kué partnership’s project will provide between 360 and 380 permanent jobs in the region during its 11-year operational life, increasing to about 700 people during construction.
Meanwhile, the project’s indicated resource has increased 12% from 50.5-million carats to 56.6-million carats, and its inferred resource has increased 80% from 10.3-million carats to 18.5-million carats.
The reasons for these increases are the upgrading of the 300 m to 360 m zone in Tuzo from inferred resource to indicated resource and including the newly defined Tuzo inferred resource from a depth of 360 m to 564 m below surface, which was delineated during the 2011/12 Tuzo Deep drill programme.
Key Contracts and Suppliers
JDS Energy & Mining (feasibility study).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
De Beers Canada Northern Territories director of external and corporate affairs Cathie Bolstad, tel +1 867 766 7325, fax +1 867 766 7347 or email Cathie.Bolstad@debeerscanada.com.
Mountain Province Diamonds, tel +1 416 361 3562, fax +1 416 603 8565 or email info@mountainprovince.com.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation