FMHL pumped-storage power station expansion project, Switzerland
Name of the Project
FMHL pumped-storage power station expansion project.
Location
Veytaux, Switzerland.
Client
Forces Motrices Hongrin-Léman (FMHL) SA, a joint venture between Romande Energie (41.14%), Alpiq (39.29%), Groupe E (13.14%) and the City of Lausanne (6.43%).
Project Description
The project will double FMHL’s capacity from 240 MW to 480 MW, making FMHL Switzerland’s second-most powerful pumped-storage power station.
The two new 120 MW turbines are housed in a 100-m-long, 25-m-wide and 56-m-high cavern, and are controlled remotely.
The power station is expected to generate about one-billion kilowatt hours of peak energy a year.
Switzerland’s largest pumped-storage project is Linthal (1 000 MW), which was inaugurated in January 2016.
Jobs to Be Created
Not stated.
Value
Swfr331-million.
Duration
Not stated.
Latest Developments
The project was inaugurated in May.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Romande Energie, email info@romande-energie.ch.
Alpiq, tel +41 21 341 22 77 or email media@alpiq.com.
Groupe E, tel +41 26 352 52 52 or fax +41 26 352 51 99.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation