Name of the Project
Fekola gold project.

Location
The project is located in south-west Mali, on the border between Mali and Senegal.

Client
B2Gold.

Project Description
The project comprises a conventional openpit owner-operated mining operation. The ultimate pit is planned for development in a sequence of six stages or cutbacks.

The final pit design will be about 2 km long, 800 m wide and 320 m deep, with an overall waste to ore (strip) ratio of 4.9:1.

The base case mine production schedule involves the movement of 32-million tonnes of material to sustain the processing of five-million tonnes a year of ore at an average grade of 2.37 g/t gold. High-, medium-, and low-grade ore will be blended throughout the mine life, with high- and medium-grade ore being prioritised to increase produced ounces and project value.

Fekola will produce an average of 374 000 oz/y to 400 000 oz/y in first five years of production (2018 to 2022) and 365 000 oz/y to 390 000 oz/y over the first seven years of production (2018 to 2024).

A waste-rock storage facility will be built to the west of the openpit, and suitable mine waste will be used for the tailings storage facility raises to the north-east of the pit.

The mill will use a conventional flowsheet, comprising single-stage primary crushing; a semiautogenous grind mill and ball mill grinding circuit with a pebble crushing grinding circuit; leach feed thickening, with thickener overflow treated through a carbon-in-column circuit; leaching followed by carbon-in-pulp adsorption; elution and gold recovery to doré; and cyanide destruction, tailings thickening and disposal circuits.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Value
$499.7-million.

Duration
The Fekola mine is expected to start production by the end of 2017.

Latest Developments
T
he first gold pour at the Fekola gold mine occurred on October 7, 2017, about three months ahead of schedule Commissioning of the mill is ongoing and commercial production is expected by the end of 2017.

Key Contracts and Suppliers
Not stated.

On Budget and on Time?
Yes.

Contact Details for Project Information
B2Gold, tel +1 604 681 8371, fax +1 604 681 6209 or email investor@b2gold.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ALBIS FLANGES (Pty) Ltd
ALBIS FLANGES (Pty) Ltd

ALBIS FLANGES — founded in 1965 — is a petro-chemical approved manufacturer of flanges and fittings in most grades of steel, listed with Sasol,...

VISIT SHOWROOM 
Sulzer Pumps (SA) (Pty) Ltd
Sulzer Pumps (SA) (Pty) Ltd

Sulzer South Africa, established in 1922, partners with critical industries like power, oil & gas, water, mining, and chemicals to boost...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.059 0.163s - 147pq - 2rq
Subscribe Now