Evander tailings treatment project, South Africa

25th April 2014

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Evander tailings treatment project (ETRP), Mpumalanga, South Africa.

Client
Pan African Resources.

Project Description
The ETRP will increase Evander’s gold production by up to 10 000 oz/y at a low cash cost.

The ETRP comprises a total mineral resource of 597 000 oz, contained in dams 1, 2 and 3 of the Kinross tailings storage facility (TSF), and a mineral reserve of 369 000 oz, contained in dams 1 and 2 of the Kinross TSF.

The original Kinross metallurgical plant was designed to treat 240 000 t/m of run-of-mine and was subsequently rationalised to its current capacity to process 60 000 t/m from surface and underground sources.

The ETRP project will refurbish the carbon-in-leach plant to treat an estimated 180 000 t/m of tailings using electro-winning and smelting to produce a saleable product.

A cost benefit of the ETRP is that no additional milling of feed material will be required.

The expected electric power requirement of the ETRP (2 800 kWh) will be sourced as part of the current Kinross plant power reticulation.

The ETRP will retreat 2.16-million tonnes a year of gold tailings over a 14-year life.

Value
The total capital expenditure for the ETRP is estimated at R200-million, of which about R110-million will be spent on plant design, refurbishment and construction, with the remainder to be spent on remining, the TSF and other infrastructure.

Duration
Civil work of the ETRP is planned to start in April 2014, with remining and plant commissioning starting in January 2015.

Build-up to full production is expected by June 2015.

Latest Developments
Long-lead items, such as leach tanks and carbon regeneration kilns, are being procured.

Key Contracts and Suppliers
Basil Read-Matomo (ETRP feasibility report and plant capital expenditure forecast, as well as the design, procurement and construction the ETRP) and Fraser Alexander (TSF feasibility report and associated capital forecast, as well as construction of the TSF and operation of the remining operation).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Pan African Resources, Elizma Coetzee, tel + 27 11 243 2900, fax + 27 11 880 1240 or email ecoetzee@paf.co.za.
Basil Read-Matomo, tel +27 11 418 6300 or fax +27 11 418 6333.
Fraser Alexander, tel +27 11 929 3600, fax +27 11 397 4607 or email fainfo@fraseralexander.co.za.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Egoli Gas (Pty) Ltd
Egoli Gas (Pty) Ltd

As a reticulator, Egoli Gas provides natural gas to homes and businesses via underground pipes.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.071 1.044s - 147pq - 2rq
Subscribe Now