East Rockingham waste-to-energy plant, Australia
Name of the Project
East Rockingham waste-to-energy (WtE) plant.
Location
East Rockingham, in Western Australia.
Project Owner/s
The project is owned by John Laing Group (40%), Masdar/Tribe Infrastructure Group (40%), Acciona Concesiones (10%), and Hitachi Zosen Inova (HZI – 10%).
Project Description
The project entails the construction of a utility-scale WtE plant to help meet Australia’s renewable power generation and local waste-management objectives in an environmentally sustainable way. The plant will generate 29 MWe of dependable electricity, enough to power more than 36 000 Australian households.
At least half of this electricity will be fuelled from renewable biogenic material, with a minimum overall carbon dioxide footprint. It will also contribute to a significant overall reduction of greenhouse-gas emissions, compared with landfilling the waste that produces methane emissions that are much more harmful than carbon dioxide.
Once completed, the WtE will treat about 300 000 t/y of waste, preventing the emission equivalent of more than 300 000 t/y of carbon dioxide into the atmosphere.
The facility will also recover about 70 000 t/y of bottom ash, which will be processed for use in road bases and other construction materials.
Potential Job Creation
The project is expected to create about 300 jobs during construction and 40 to 50 jobs during operation.
Capital Expenditure
A$510.8-million.
Planned Start/End Date
The centre is expected to be operational by 2023.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
GE Steam Power (steam turbine).
Contact Details for Project Information
John Laing (Australia), tel +61 2 8999 9104 or email enquiry-APAC@laing.com.
Tribe Infrastructure Group, tel +61 437 820374 or email australia@tribeig.com.
Acciona Concesiones, tel +34 91663 2850 or email gabinetedeprensa@acciona.es.
Hitachi Zosen Inova, TEL +41 44 277 11 11 or email info@hz-inova.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation