Name of the Project
Dougou extension (DX) project.

Location
The DX deposit is located within Kore Potash’s Dougou mining permit, south-west of the company’s flagship Kola sylvinite deposit, in Congo-Brazzaville, which will be a separate development.

Project Owner/s
Kore Potash.

Project Description
A scoping study has demonstrated the low technical risk and attractive economics of the project.

The base case economic evaluation proposes a mine life of about 17 years based on solution mining of 52-million tonnes of indicated mineral resources grading 43.1% potassium chloride from a total indicated mineral resource base of 111-million tonnes grading 37.2% potassium chloride.

Total mineral resources are estimated at 232-million tonnes grading 38.1% potassium chloride.

The project proposes a selective dissolution mining method using vertically drilled dual well caverns, which involves two single well caverns that are solution mined until the caverns merge. The project aims to produce 400 000 t/y of white granular muriate of potash.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
In the base case the project has an after-tax net present value, at a 10% discount rate, of $221-million and an internal rate of return of 19.3%, with a payback of 4.25 years from first production.

Capital Expenditure
The project is estimated at $327-million.

Planned Start/End Date
The project is expected to take two years to construct.

Latest Developments
Several areas of the scoping study were completed to a higher level of confidence than is normal for a scoping study; therefore, the work required to complete a prefeasibility study, once started, is estimated to require only nine months. The drilling of four more diamond holes is the item currently controlling the overall timeframe for the project.

Key Contracts and Suppliers
Innovare Technologies (mining, drilling methodology and process design).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Kore Potash, tel +27 11469 9144 or email info@korepotash.com.

 

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.047 1.055s - 147pq - 2rq
Subscribe Now