Name and Location
Central Eyre iron project (CEIP), Australia.

Client
Iron Road.

Project Description
A Class 3 mine optimisation programme has validated, improved and further derisked the 2014 definitive feasibility study findings on the CEIP.
Iron Road has been focused on advancing the CEIP, which includes a proposed long-life mine and processing plant, as well as regionally supportive rail and port infrastructure.

The mine has been designed for in-pit crushing and conveying, with fully mobile and semimobile crushers, as the characteristics and size of the orebody are ideally suited to this mining method.

Mobile in-pit crushers will be connected to the main pit conveying system by smaller dedicated fully mobile conveyors. Each component is relocatable using transport crawlers, allowing for components to be easily moved during pit advance.

The optimisation programme proposes the construction of a modularised ore processing facility on the south-east perimeter of the proposed pit.

The facility has three discreet processing trains to provide a high level of plant availability and to minimise operational downtime.

The three processing trains of the ore processing facility will incorporate seven main modules – a semiautogenous grinding mill, a rougher magnetic separator, a gravity beneficiation circuit, a regrind mill, a ball mill, a cleaner magnetic separator and a tailings filter building.

The ore processing facility will process up to 175-million tonnes (dry) a year of feed material at an overall average head grade of about 16% iron, producing 24-million tonnes a year of iron concentrate (dry basis) at an estimated 67% iron.

Dewatered coarse tailings from each process train will be discharged onto the tailings transfer conveyor and the filtered moist fine tailings will be transferred to the waste rock conveyor originating from the mine. The combined tails and waste rock will be stacked on the integrated waste landform by a mobile spreader. This method minimises water use and reduces the waste storage footprint.

Iron concentrate will be transported from the mine site by a standard gauge, heavy haul rail system along the infrastructure corridor to a new port facility at Cape Hardy.The bulk commodities port facilities are located at Cape Hardy, 7 km south-west of Port Neill. The port is planned to have an initial capacity of 70-million tonnes, with the main export wharf capable of handling Panamax and Capesize vessels. Two shipping berths for bulk iron-ore carriers will be serviced by a slewing, luffing and travelling shiploader.

Net Present Value/Internal Rate of Return
Not stated.

Value
Total capital expenditure is estimated at $4.01-billion

Duration
Not stated.

Latest Developments
None stated.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Iron Road, tel +61 8 8214 4400, +61 8 8214 4440 or email admin@ironroadlimited.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Columbus Stainless
Columbus Stainless

Columbus Stainless, based in Middelburg, Mpumalanga, is Africa’s only producer of stainless steel flat products. In addition, Columbus is the only...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.051 1.416s - 146pq - 2rq
Subscribe Now