https://www.engineeringnews.co.za

Cadia expansion project, Australia – update

16th October 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Cadia expansion project.

Location
New South Wales, Australia.

Project Owner/s
Newcrest Mining.

Project Description
The Newcrest board has approved the first of two stages of the Cadia expansion project.

The first stage comprises the start of the next cave development (PC2-3) and an increase in the nameplate capacity of the process plant to 33-million tonnes a year.

The feasibility study for PC2-3 recommends several mine design changes from the 2018 prefeasibility study, including:

∙ the relocation of the crushing and materials infrastructure to the eastern side of the footprint, which has lower exposure to potential seismic activity, thereby enhancing the safety of personnel and reliability of the operation.

∙ an increase in the number of extraction drives (from nine to 14).

∙ a reduction in operational constraints, which is expected to increase production rates from 13-million tonnes a year to 15-million tonnes a year.

The plant expansion includes upgrades to concentrator circuits 1 and 2, the addition of a coarse-ore flotation circuit and ancillary upgrades to equipment.

Concentrator 1 is currently constrained by secondary crushing motor power and semiautogemous grinding (SAG) motor power. The plant expansion works in Stage 1 of the Cadia expansion project aim to increase Concentrator 1 throughput in stages, from 23-million tonnes a year up to 25-million tonnes a year through conveyor upgrades, and the installation of a new secondary crushing circuit, which together, are expected to increase throughput by one-million tonnes a year). The works also aim to replace a SAG mill motor to increase power from 20 MW to 22 MW, also with an expected increase in throughput of one-million tonnes a year.

The Cadia expansion feasibility study recommends increasing the grind size, which allows for a further one-million tonnes a year in expected throughput of Concentrator 1 to a total rate of 26-million tonnes a year. Together with the currently installed capacity of Concentrator 2 of seven-million tonnes a year, this provides Cadia with 33-million tonnes a year of milling capacity.

The second stage is focused on a further increase in processing capacity to 35-million tonnes a year and recovery-rate improvement projects targeted for completion in 2022, ahead of the completion of the cave development.

Average yearly gold production is estimated at 381000 oz and average yearly copper production at 77000 t over the project’s 45-year mine life.

Potential Job Creation
Stage 1 and 2 of the Cadia expansion project are expected to generate direct employment of about 860 people at peak.

Net Present Value/Internal Rate of Return
The net present value for both stages is estimated at $1.17-billion, with an internal rate of return of 21.5% and a payback of 7.6 years.

Capital Expenditure
Stage 1 is estimated at $685-million and Stage 2 at $180-million.

Planned Start/End Date
The PC2-3 mine is targeting first production in the 2023 financial year.

Latest Developments
Newcrest has approved a A$175-million spend on the expansion project, which will result in the addition of a second coarse-ore flotation circuit installed in Concentrator 1, as well as equipment upgrades to Concentrator 2.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Newcrest Mining, tel +61 3 9522 5333 or email corporateaffairs@newcrest.com.au.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Columbus Stainless
Columbus Stainless

Columbus Stainless, based in Middelburg, Mpumalanga, is Africa’s only producer of stainless steel flat products. In addition, Columbus is the only...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.057 0.981s - 148pq - 2rq
Subscribe Now