Bushveld iron-ore project, South Africa
Name and Location
Bushveld iron-ore project, Limpopo, South Africa.
Client
Bushveld Minerals.
Project Description
The Bushveld project is based on three adjacent new-order prospecting rights on 12 farms, covering 25 207 ha.
A scoping study has been completed on the larger, but lower-grade, iron and vanadium P-Q zone, equating to 12% of the total Joint Ore Reserves Committee (Jorc) resource. The study highlights a low capital expenditure (capex) and product route at a base case run-of-mine of five-million tonnes a year.
There is scope for project mining volumes to be ramped up to seven-million tonnes a year, given that the scoping study uses only 12% of the current resource, which is based on only 5.5 km of a potential 18 km strike. This is subject to a rail infrastructure capacity study being undertaken.
The project also offers opportunity for downstream beneficiation.
Value
The project has a low capex of $126-million.
Capex for a seven-million-tonne-a-year operation is estimated at $153-million.
Duration
Bushveld aims to start production in 2016.
Latest Developments
Bushveld Minerals has increased its Jorc-compliant mineral resource increase at the Bushveld iron-ore project by 29%.
The project currently boasts a total inferred and indicated mineral resource of 991-million tonnes, which includes 52-million tonnes at a 40% iron oxide (Fe2O3) cutoff on the main magnetite layer (MML).
The total inferred and indicated mineral resource for the P-Q zone deposit is 939-million tonnes of iron-ore at a cutoff of 35% Fe2O, after a 31% resource increase from farms Schoonoord 786LR and Bellevue 808LR.
Bushveld expects to deliver a mineral resource of more than one-billion tonnes through the delineation of further openpittable tonnes to the south, along further strike extensions of this mineralisation.
Meanwhile, the company continues progressing the downstream development of the project towards production, with a detailed metallurgical testwork programme, including pyrometallurgical testwork, as part of its prefeasibility studies.
The intention is to add a scalability proposition to the realisable, relatively low-capital expenditure production scenario of the scoping study announced in April 2013, which envisages using a fraction of the current resource.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Bushveld Minerals, tel +27 11 268 6555 or fax +27 11 268 5170.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation