https://www.engineeringnews.co.za

Bakwena invests R160m in plaza upgrades

Bakwena invests R160m in plaza upgrades

Photo by Duane Daws

14th March 2016

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

  

Font size: - +

Highway operator Bakwena Platinum Corridor Concessionaire is investing R160-million in upgrades at the Zambesi, Pumulani, Stormvoël, Doornpoort, Brits and Marikana plazas.

The upgrades were being implemented as a consequence of increased traffic volumes along the corridor and would increase plaza capacity through the addition of new lanes. Construction had already started and was expected to be completed by December 2017.

“The additional lanes will be worked on and completed with as little disruption as possible at the individual plazas, which means that the existing flow of traffic will be maintained or improved,” Bakwena CEO Graeme Blewitt said.
 
The Zambesi plaza would be first to benefit from the upgrade, with two extra lanes being built at the on- and offramps. The extrawide lane on the onramp to the freeway was closed to accommodate the upgrade.

The extrawide lane on the offramp would also be closed from March 17; however, measures were in place to alleviate traffic congestion during the peak period between 06:00 and 07:30 at the onramp and from 16:30 to 18:00 on the offramp.

The opening of the two new lanes was expected to take three months, with the complete construction works to be fully operational by end-October.

Once Zambesi was completed, Pumulani, Stormvoël, Doornpoort, Brits and Marikana would follow.

Two extra lanes would be added at the Pumulani and Doornpoort plazas, one additional lane in each direction at the Brits and Marikana plazas, and one lane at the Stormvoël plaza on- and offramp.

Work had also started on the upgrade to the Wallmannsthal onramp to add an additional Class 1 electronic toll collection lane to alleviate the congestion during the morning peak. In the interim, measures would be implemented to alleviate the current congestion.
  
“We are confident that the upgrades will be completed according to the projected timetable, as we do not anticipate undue disruption. However, we ask that road users practice caution when approaching relevant toll plazas during the construction period,” Blewitt said.
 

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
Vikela Aluvin (Pty) Ltd
Vikela Aluvin (Pty) Ltd

Complete range of security sealing solutions including security seals bags and labels.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.057 0.932s - 158pq - 2rq
Subscribe Now