Arcadia lithium project, Zimbabwe
Name of the Project
Arcadia lithium project.
Location
The project is located outside Harare, in Zimbabwe.
Project Owner/s
Prospect Resources (87%).
Project Description
A definitive feasibility study (DFS) on Arcadia has confirmed the project’s strong financial and geological merits, positioning the company to be a leading producer of lithium and battery minerals.
The project has total proven and probable reserves of 26.9-million tonnes grading 1.31% lithium oxide (Li2O) and 128 parts per million (ppm) tantalum pentoxide (Ta2O5). Total mineral resources are estimated at 43.2-million tonnes grading 1.41% Li2O and 119 ppm Ta2O5.
The DFS envisages a 2.4-million-tonne-a-year conventional openpit mining operation, producing average concentrate of about 212 000 t/y of 6% spodumene, 216 000 t/y of 4% petalite, and 188 000 lb/y of tantalum.
Mineral processing will be based on the use of conventional beneficiation techniques, including gravity-based processes of dense-medium separation and spirals, to recover petalite and tantalite. Froth flotation will be used to recover spodumene.
Process tailings will be disposed of to an engineered tailings storage facility.
The project is expected to have a 12-year mine life.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of $511-million and an internal rate of return of 44%, with a payback of 2.5 years.
Capital Expenditure
The cost of the project gas decreased from $165.2-million $163-million.
Planned Start /End Date
The ground-breaking ceremony for the project was held in November 2018. The project is expected to be completed in the third quarter of 2020, with commissioning from November 2020.
Latest Developments
Prospect Resources has completed a plant optimisation at its Arcadia project to allow for the installation of a high-pressure grinding roll (HPGR).
The HPGR option will simplify the project’s processing design, replacing tertiary and quaternary crushers, delivering a capital expenditure reduction of about $2.3-million, to $163-million, and reducing operating costs by about 2.46%, or $7/t, to about $278/t.
Prospect is undertaking additional value engineering initiatives at Arcadia, including a review of the project’s logistics.
Key Contracts and Suppliers
Roger Tyler (resource definition); ADP Marine & Modular (DFS – process design review, final engineering cost estimate, HSE management plan, project execution plan and quality management plan); DRA Global (process design); Gayle Hanssen (resource modelling); Adam Moodley (project geologist); Practara (geotechnical services); David Miller (mine planning); Envirosmart (environmental-impact assessment); Constant Chuma (hydrogeological assessment); Mike Kitney (metallurgy); Blonton Management (tailings disposal facility design); Norconsult (electrical network analysis); JJ Transport (transport fleet study); Lee John (consultant metallurgist); Trevor Barnard (project manager); David Miller (minerals marketing) and Iain Sheasby (project modelling).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Prospect Resources, tel +61 8 9217 3300 or email info@prospectresources.com.au.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation