Ancuabe graphite project, Mozambique

9th February 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ancuabe graphite project.

Location
Cabo Delgado province, Mozambique.

Client
Triton Minerals.

Project Description
Ancuabe has a maiden Joint Ore Reserves Committee-compliant ore reserve of 24.9-million tonnes at 6.2% total graphitic carbon based on two graphite mineral deposits – T12 and T16.

A definitive feasibility study (DFS) on the deposits has confirmed the high-quality, long life and high margin of the graphite project.

The DFS is based on production of about 60 000 t/y of graphite concentrate over 27 years. The mine plan is based on the ore reserve, and less than 5% of the production is sourced from inferred mineral resources, which is mined to access the ore reserve.

It is planned that conventional drill-and-blast, load-and-haul, openpit mining will be employed to extract the mineralised material.

Run-of-mine (RoM) feed will be defined by grade-control procedures in the pit, and delivered by truck to the RoM pad located centrally between the T12 and T16 deposits. Waste will need to be classified according to its potential to be acid forming and be dumped in managed waste dumps adjacent to the openpits. It is planned that mining will be carried out by an experienced earthmoving contractor.

Ancuabe’s process plant will have a throughput from 900 000 t/y to 1.1-million tonnes a year to produce an estimated 60 000 t/y graphite concentrate. The proposed process plant facilities include:
• an RoM pad;
• a tertiary crushing circuit;
• a rod mill feed bin and grinding circuit;
• rougher flotation;
• three stages of attritioning and five stages of cleaner flotation;
• concentrate filtration;
• concentrate drying, classification and bagging three products;
• tailings thickening and storage; and
• reagents.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an unleveraged pretax net present value, at a 10% discount rate, of $298-million and an internal rate of return of 36.8%, with a near-term payback of 3.8 years.

Value
Preproduction capital costs are estimated at $99.4-million, including contingency.

Duration
Production is planned to start in the second half 2019, subject to financing and board approvals.

Latest Developments
Triton has approved the start of detailed engineering and early works subject to Mozambique government approvals. Progression to construction is subject to the completion of an appropriate financing strategy.

Key Contracts and Suppliers
Lycopodium and ADP Group (process and plant infrastructure); Knight Piésold (tailings and water storage facilities and site geotechnical investigations); CSA Global (geology and resources, as well as mining and mine design); IMO, ALS Metallurgy
(metallurgical testwork); Major Drilling (project drilling); Intertek and Bureau Veritas (assays); and EOH Coastal & Environmental Services Limited (environmental-, social- and health-impact assessments).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Triton Minerals, tel +61 8 6489 2555 or fax +61 8 6489 2556.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 
Flanders Electrical SA
Flanders Electrical SA

FLANDERS Southern Africa provides integrated solutions for mining and industrial operations, covering field services, automation, electrification,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.05 0.845s - 127pq - 2rq
Subscribe Now