Al Kharsaah solar photovoltaic independent power producer project, Qatar

6th March 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Al Kharsaah solar photovoltaic (PV) independent power producer (IPP) project.

Location
About 80 km west of Doha, Qatar.

Project Owner/s
The project will be developed and operated by Siraj 1 SPV, jointly owned by a consortium comprising Total Solar International and Marubeni (40%), alongside Siraj Energy (60%), a joint venture between Qatar Petroleum (40%) and Qatar Electricity & Water Company (60%).

Project Description
Al Kharsaah will be Qatar’s first large-scale solar power plant. It will be built on more than 1 000 ha and equipped with two-million bifacial solar modules with trackers, allowing for substantial power gains and leveraging the advantage of the exceptional sunlight exposure in the region.

It will represent about 10% of electricity peak demand of the country and will reduce Qatar’s emission of carbon dioxide by 26-million tons during the life of the project.

Potential Job Creation
Not stated.

Capital Expenditure
The project is estimated at $500-million.

Planned Start/End Date
Power will be supplied to the grid from 2021, with an initial capacity of 350 MW, reaching its full capacity in 2022.

Latest Developments
None stated.

Key Contracts and Suppliers
None stated.

Contact Details for Project Information
Total investor relations, tel +44 207 719 7962 or email ir@total.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
Monitor Distributors
Monitor Distributors

We at Hawk High Pressure Pumps specialise in industrial pumps and pumping systems. Our high pressure washing equipment is locally manufactured and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.079 0.897s - 145pq - 2rq
Subscribe Now