Tharisa PGMs underground project, South Africa – update

17th April 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Tharisa PGMs underground project.

Location
Western limb of the Bushveld Complex, in South Africa’s North West province.

Project Owner/s
Integrated resource group Tharisa Minerals.

Project Description
The Tharisa platinum group metals (PGMs) mine is transitioning to underground operations. The mine’s openpit operations are expected to be depleted by the 2035 financial year. 

The underground expansion offers a high-confidence, low geological risk opportunity and indicates more than 60 years of underground mining potential.

The existing processing facilities have a capacity of 5.6-million tonnes a year run-of-mine, ensuring production scalability and operational flexibility.

The addition of underground ore from Tharisa’s West mine (Apollo Complex) and East mine (Orion Complex) from 2031 will ensure that the nameplate processing capacity of 5.6-million tonnes a year is achieved and exceeded. 

The Apollo and Orion complexes will be developed sequentially. 

The phased portal strategy starts with Apollo, where three access points are sequenced to optimise entry into reef layers while minimising complexity and development risk. The Orion complex will mirror Apollo’s design, providing operational consistency. 

The complexes have been designed to mine 255 000 t a month at steady state with a combined production rate of 510 000 t a month, capped at the processing facility’s feed capacity. This will maintain current PGMs and chrome concentrate production with growth opportunities, owing to smarter mining and less dilution.

The phased approach to portal development allows for early access to reef, with the bord-and-pillar design supporting safe, cost-effective ramp-up and long-term operational efficiency.

Potential Job Creation
The transition plan includes a partner-driven workforce strategy that phases in labour ramp-up while retraining and transitioning openpit employees to underground roles.

Net Present Value/Internal Rate of Return
Not disclosed.

Capital Expenditure
Transitional capital for the dual project development over the ten-year period is $547-million.

The Apollo complex carries a capital cost of $363-million, while Orion requires $184-million.

Planned Start/End Date
Apollo is expected to deliver first ore in the second quarter of 2026 and ramp up to steady-state production of 255 000 t a month by the third quarter of 2029. 

Orion will follow, with portal development starting in the first quarter of 2031, first ore targeted for the fourth quarter of that year, and steady-state production of 210 000 t a month by the third quarter of 2033, with potential to expand to 255 000 t a month. 

Latest Developments
Tharisa has reported in its results for the second-quarter production report of 2026 that the official start of underground development at the mine took place on March 31, 2026, with the first blast at the Apollo portal. This marked the start of underground mining in parallel with the existing openpit operations.

Tharisa has said the underground development supports the long-term future of the mine, with more than 60 years of underground mining potential. It also plans to invest more than $500-million over the next decade to sustain optimal output of more than 200 000 oz/y of PGMs and two-million tonnes of chrome concentrate.

Key Contracts, Suppliers and Consultants
Provest (drilling and installation of anchors and roof bolts, shotcrete application, grout plant operations and grout pack installations services); Enaex Africa (explosives); Komatsu (mining equipment); MacLean Engineering (underground
mobile equipment solution); Sandvik mining industry engineering group); Cementation Africa (mining contractor); Dwyka Labs (technical partner for smart mining technologies); RSV (engineering services); Middindi Consulting (geotechnical studies); KLM Consulting Services (structural geological and hydrogeological design); Pivot Mining Consultants (geology and mineral resources); Ukwazi Mining Studies (mine design); AMS Haden (ventilation design); Manyabe Consulting (environmental-impact assessment report); Sight Africa (trackless mobile machinery solutions); Artesium Consulting Services (water balance and mass load studies);Plan A-Head Studies (labour model); Epoch (tailings design); PQS Profection Quantity Surveyors (basis of estimate).

Contact Details for Project Information
Tharisa Minerals, tel +27 11 996 3500 or email ir@tharisa.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Creamer Media's Research Reports are available to subscribers.

  • If you are a Research Chanel Africa subscriber, click here to log-in to Research Chanel Africa.
  • If you are a magazine-and-online subscriber to Creamer Media's Engineering News & Mining Weekly, your subscription entitles you to one free research report of your choice. You would have received a promotional code at the time of your subscription. Have this code ready and click on "Buy Report". You will be directed to the Creamer Media Online Store and, at the time of check-out, please enter your promotional code to download your free report. Email subscriptions@creamermedia.co.za if you forgot your promotional code.

    If you have previously accessed your free report, you can purchase additional Research Reports by clicking on the “Buy Report” button below the Research Report that you wish to purchase and you will be directed to Creamer Media's Online Store.
  • If you are not a subscriber, you can either buy the individual research report by clicking on “Buy Report” or you can subscribe and, not only gain access to your report, but also enjoy all other subscriber benefits. Click on the “Subscribe and Download” button if you wish to subscribe or find out more.

    The most cost-effective way to access our Research Reports is by subscribing to Creamer Media's Research Channel Africa - you can upgrade your subscription now at this link.

Showroom

Columbus Stainless
Columbus Stainless

Columbus Stainless, based in Middelburg, Mpumalanga, is Africa’s only producer of stainless steel flat products. In addition, Columbus is the only...

VISIT SHOWROOM 
Kriel Occupational Health Centre
Kriel Occupational Health Centre

Occupational health services, mobile clinics, wellness campaigns, aviation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.102 1.147s - 185pq - 2rq
Subscribe Now