Waitsia gas project Stage 2, Australia

11th September 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Waitsia gas project Stage 2.

Location
The project is located about 16 km south-east of the Dongara-Port Denison town sites, in Western Australia.

Project Owner/s
AWE Perth, a subsidiary of Mitsui E&P Australia.

Project Description
The Waitsia gasfield is ranked as one of the top five largest gasfields ever discovered onshore in Australia.

Waitsia Stage 2 will involve further development of the gasfield, with more wells and a new production facility capable of producing 250 TJ/d.

The proposed production facility will draw from up to eight production wells phased over a 20-year life cycle and will convey gas through the nearby Dampier to Bunbury natural gas pipeline. Two of these production wells are already developed and up to six more are planned to be drilled over the next few years.

The project further includes the installation of a gas-gathering system, comprising flowlines and hubs, and the installation of a flowline from the proposed gas plant for water reinjection through a disused petroleum production well.

Potential Job Creation
During the development phase, an estimated 200 jobs will be created. During the operation phase, an estimated 12 to 15 permanent jobs associated with Waitsia Stage 2 will be created.

Capital Expenditure
Not stated.

Planned Start/End Date
Not stated.

Latest Developments
The project has been recommended for environmental approval by the Western Australian Environmental Protection Authority, subject to strict conditions on water management, flora and greenhouse-gas emissions.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
AWE Perth, tel +1 61 8 9486 7333.
Mitsui E&P Australia, tel +61 8 6364 4777 or email enquiry@mepau.com.au.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION