EZY Switchgear

10th September 2021

     

Font size: - +

Founded in 2019, EZY Switchgear specialises in switchgear refurbishment with a particular focus on complex SF6 gas insulated switchgear.

The complicated nature of gas insulated switchgear requires the expertise of a highly skilled and trusted service provider and EZY Switchgear’s vast experience and knowledge ensures successful implementation of site services and completion of projects.

EZY Switchgear’s refurbishment factory specialises in repairs and refurbishment of ABB, Schneider, Siemens and TGood secondary switchgear, also called Ring Main Units, or RMU, such as the SafeRing, SafePlus and RM6. EZY Switchgear is synonymous with reliability and all EZY 
quality repairs, equipment and projects are backed by a 12 month warranty. In addition, all EZY Switchgear projects undergo comprehensive testing and are signed off by a professional engineer before handover.

Located at 904 Caledon Street, Daspoort, Pretoria, the EZY Switchgear facility encompasses a 300m2 undercover area on a leased 600m2 site. The company has a streamlined structure with low overheads, allowing EZY to provide services at a fraction of the original-equipment manufacturer costs.

EZY Switchgear has a Level 2 broad-based black economic empowerment shareholding, with a turnover of R10- million to R15-million a year. It focusses on projects valued at R150 000 to R14-million – a sector that is underserviced by larger consultancies and contractors.

EZY Switchgear has completed a number of significant projects over the last year, including the upgrade of VKB Mills in Mokopane, LFC Mills in Wesselsbron, BCL Limited in Botswana and Mulilo De Aar solar farm.

EZY Switchgear follows a very strict quality process and every unit is tested three times before it leaves the EZY workshop. A unit is stripped to its barebones and rebuilt using the correct materials and spares. In addition,  EZY Switchgear has all the test equipment required to provide a test certificate to its customers.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION