Transnet undertakes upgrades at various terminals

2nd July 2020

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Transnet Port Terminals (TPT) has prepared for a 13% increase in citrus volumes this year, with new equipment being set up to boost operations at the Port Elizabeth, Durban and Ngqura container terminals.

This follows the Citrus Growers Association’s forecast that new orchards coming into production and good rains across some regions would bode well for citrus harvests.

South Africa ranks sixteenth in terms of world fruit production. Fruit accounts for more than 50% of the country’s overall agricultural exports, which means a contribution of about R43-billion a year to South Africa’s gross domestic product.

TPT says season preparations require sufficient plug points across all container terminals, as well as human capital.

“We have made provision for additional plug points to ensure reefer handling, leasing generator packs as back-up in some areas of the business,” says TPT sales and new business development GM Siyabulela Mhlaluka.

Earlier constraints resulted in the container terminals across TPT operating at an average 75% capacity.

The available numbers were impacted on by a number of employees with chronic medical conditions, compromised immune systems and those that were 60 years and above, in line with the special measures implemented arising from the government regulations amid Covid-19.

Two new mobile harbour cranes at the port in Port Elizabeth have been commissioned and handed over to operations. Equally, Durban Container Terminal (DCT) Pier 2 would have taken delivery of 23 of its 45 new straddle carriers from the end of July.

“Regular industry engagements and integrated planning leaves us optimistic. The guided levels of operation over Level 5 cannot be isolated. Over a two-month period, the Level 5 lockdown regulations restricted the movement of cargo,” says Mhlaluka, adding that it was now all systems go.  

The current R2-billion investment in replacement equipment will see an additional four rubber-tyred gantry cranes for Cape Town’s port arriving in November.

Twenty-two additional straddle carriers will be delivered to DCT Pier 2 in December and two rubber-tyred gantry cranes for DCT Pier 1 in the same period.

“We have a robust plan for replacing equipment across our terminals through to 2024 and as we have promised to industry, we are tracking according to plan”.     

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION