Singrobo-Ahouaty hydropower plant, Côte d’Ivoire
Name of the Project
Singrobo-Ahouaty hydropower plant.
Location
The project is located on the Bandama river between Abidjan and Yamoussoukro, Côte d’Ivoire.
Project Owner/s
Ivoire Hydro Energy (IHE).
Project Description
The project involves the construction of a 44 MW hydropower plant.
The project includes the construction of a concrete rockfill dam, a spillway, a turbine plant, a discharge channel, the switchyard, the power line connecting the plant to the grid, temporary facilities and access roads.
Eiffage Génie Civil and Eiffage Én Work was expected to start in the first quarter of 2019 and to last for three years. The project will achieve a carbon dioxide reduction of 124 000 t/y.
Potential Job Creation
The project will create about 500 jobs during construction.
Capital Expenditure
Not stated.
Planned Start/End Date
The order to start works was issued in May 2020 and is expected to take 34 months to complete.
Latest Developments
In strict compliance with the health provisions imposed by the Côte d’Ivoire government to combat the Covid-19 pandemic, and with a constant concern to guarantee the health safety of employees, Eiffage Génie Civil's international teams are continuing the preparatory work for the hydroelectric project.
In April, the construction of a cofferdam upstream of the future dam, designed to divert the waters of the Bandama river, allowed for the first rights-of-way for the structures to be built on the left bank of the river to be dewatered.
This first phase of preparatory work will enable Eiffage to conduct the additional geotechnical and topographical surveys needed by the company’s regional office, Biep.
The construction of the initial infrastructure pertaining to the site facilities (technical platform and base and/or office) is continuing.
Key Contracts and Suppliers
Eiffage Génie Civil and Eiffage Energie Systèmes (design-build contract).
Contact Details for Project Information
IHE, tel +225 22 41 37 57 or email contact@iheci-spv.com.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation