Shanta lifts first-half gold output by 11% y/y
Aim-listed Shanta Gold on Thursday posted an 11% year-on-year increase in gold production to 42 230 oz for the first half of this year.
The East Africa-focused gold producer, developer and explorer’s production for the second quarter, at 19 856 oz, was, however, lower than the 22 374 oz produced in the first quarter.
Nevertheless, Shanta remains “comfortably” on track to meet its yearly guidance of 80 000 oz to 84 000 oz at an all-in sustaining cost (AISC) of $740/oz to $780/oz.
During the second quarter under review, Shanta achieved an AISC of $773/oz, while the year-to-date AISC reached $735/oz – below full-year guidance.
The group achieved an all-time daily throughput record during the quarter with 177 647 t milled.
Meanwhile, the company posted a 22% decrease in gross debt to $30.1-million, after a $4.9-million partial buyback of outstanding convertible loan notes.
Net debt was down 11% to $26.9-million during the second quarter, while cash operating costs stood at $564/oz.
Earnings before interest, taxes, depreciation and amortisation fell from $11.7-million in the first quarter of the year to $10.5-million in the second quarter of the year.
Meanwhile, underground exploration drilling results released during the period showed the best historical intersected grades and widths since production began at New Luika, Shanta noted.
“New high-grade intersections are outside existing mineral reserves and will be incorporated into the mine plan,” the company said in an update to shareholders.
Drilling at Bauhinia Creek Central has converted 126 787 oz of inferred resources, grading 3.15 g/t, into 83 543 oz of indicated resources, grading at 7.85 g/t, and added new inferred resources of 58 553 oz, grading 4.79 g/t.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation