Riau gas-fired combined-cycle gas turbine power project, Indonesia

31st August 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Riau gas-fired combined-cycle gas turbine power project.

Location
Riau, Sumatra, Indonesia.

Client
PT Medco Ratch Power Riau, comprising PT Medco Power Indonesia and Ratchaburi Electricity Generating Holding Company.

Project Description
The project will be a baseload power plant with a capacity of 1 445 GWh/y and will include a gas pipeline, water intake and a discharge line, cooling towers for a closed cooling system, a switchyard, an access road and a transmission line. The main plant will comprise two 81 MW gas turbines, two heat recovery steam genera-tors (HRSGs) and one 126 MW steam turbine and generator, in a combined-cycle configuration.

The gas turbine and HRSG will have dry, low nitrogen oxide combustors. Two 45-m-high stacks are proposed. Natural gas for the power plant will be supplied by PT Perusahaan Listrik Negara (PLN) through a dedicated 12 high-pressure buried pipeline to the regulating and metering station to be established on the project site.

The power generated by the project will be transferred to PLN’s existing150 kV Tenayan–Pasir Putih transmission live through a new 750-m-long 150 kV transmission line that will be connected to the existing transmission line. Indonesia State-owned power utility will be the offtaker for the electricity generated by the project.

Potential Job Creation
The project is expected to create 1 000 construction jobs and 300 gas pipeline jobs.

Value
The project is estimated at $287-million.

Duration
About 36 months to complete.

Latest Developments
None stated.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
PT Medco Power Indonesia, tel +62 21 2995 3000 or fax +62 21 2995 3001.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION