Oak Hill Parkway infrastructure project, US

3rd July 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Oak Hill Parkway infrastructure project.

Location
Austin, Texas, in the US.

Project Owner/s
Texas Department of Transportation (TxDOT).

Project Description
This project is part of the TxDOT’s long-term plan to promote congestion management in one of Texas’ most congested corridors.

The estimated 11 km design-build project will widen and improve US 290 and State Highway 71 through Oak Hill, and act as a gateway to the hill country. It will also serve as a key route to Austin for the residents of Oak Hill, Lakeway, Bee Cave, Dripping Springs and other growing communities west of Austin.

The project will result in the widening of two main lanes to three for through-traffic in each direction, and in three frontage-road lanes in each direction. An overpass for the US 290 main lanes over William Cannon drive will be built, along with direct-connect flyovers between US 290 and State Highway 71.

Along Highway 71, the flyover ramps will extend past Scenic Brook drive, where the main lanes will transition to a five-lane (three lanes westbound; two lanes eastbound) rural highway with U-turns for local access.

Bicycle and pedestrian accommodations will be built along the entire corridor, including an 11 km shared-use path, sidewalks and a trailhead at Williamson Creek on William Cannon drive to accompany new landscaping, tree plantings and corridor aesthetics.

Additional project components include cross-street intersection improvements, U-turn lanes, an upstream water detention to reduce potential flooding, and stormwater detention and water-quality treatment ponds.

Potential Job Creation
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Construction is scheduled to begin in early 2021, with project completion slated for 2025.

Latest Developments
The Fluor Corporation and Balfour Beatty joint venture has been conditionally selected by the TxDOT to reconstruct and widen US 290 from about the east end of Circle drive to Loop 1 and State Highway 71 from US 290 to Silvermine drive in Travis County, west of downtown Austin, Texas.

Key Contracts and Suppliers
Fluor Corporation and Balfour Beatty joint venture (US 290 reconstruction).

Contact Details for Project Information
TxDOT, tel +1 512463 8588.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION