Nersa approves Transnet petroleum tariff

1st March 2021

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

The National Energy Regulator of South Africa (Nersa) has set the Petroleum Pipelines System tariff, which will allow State-owned rail entity Transnet to realise an 11.15% decrease in allowable revenue (AR) compared with the 2020/21 tariff period.

However, owing to a forecasted reduction in the volumes of petroleum products transported, this translates to a 2.39% tariff increase for the Durban-to-Alrode (JHB) route.

Should Mineral Resources and Energy Minister Gwede Mantashe decide to use the pipeline tariff as a proxy for the cost of transporting fuel from Durban to Johannesburg, as has been the case in the past, the consequent tariff increase of 2.39% will result in an increase of about 1.22 c/ℓ in the petroleum transportation levy for the Durban-to-Alrode route.

In September last year, the energy regulator received Transnet’s tariff application for the 2021/22 tariff period, as a condition of its licence to operate its Petroleum Pipelines System.

The Transnet tariff is set for a period of one year, from April 1, 2021, to March 31, 2022.

Transnet applied for a decrease of 11.15% in allowable revenue, mainly as a result of a lower weighted average cost of capital of 6.36% in 2021/22 versus 7.89% in 2020/21.

The increase in the tariff is owing to the decrease in volumes from the 17.6-billion litres forecasted for 2020/21 to 15.8-billion litres.

Nersa decided on the allowable revenue of R5.5-billion, which is said to be “negligibly lower than Transnet’s own application” and settled on the same tariff increase of 2.39%.

The negligible difference may be attributed to the energy regulator’s robust pre-application engagements to educate licensees on its tariff methodologies, procedures and rules.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION