Green, high-purity pig iron project, Saudi Arabia

8th March 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Green, high-purity pig iron project.

Location
The facility is proposed to be located in, or close to, the industrial areas adjacent to the King Fahad Industrial Port, in Jubail, Saudi Arabia.

Project Owner/s
A 50:50 joint venture between Magnum Mining & Exploration and Middle East for Metallic Industrial (Midmetal).

Project Description
An engineering study has assessed a HIsmelt-based 1.1-million-tonne-a-year pig iron production facility to capitalise on Saudi Arabia’s drive for  low-emissions steel production.

HIsmelt is a smelting reduction iron-making process that directly smelts preheated ferrous materials (iron-ore fines, C-fines and slags), and reductants (noncoking coal and biomass char) as the system’s source of reducing agents and heat.

The facility will use high-grade magnetite concentrate from Magnum’s 100%-owned Buena Vista iron project, in the US, and iron waste materials from existing iron-ore processing facilities, in Saudi Arabia, as well as other potential locations.

To meet the requirement for green, net-zero (or close to net-zero) carbon emissions from the project, it is planned that the reductant for the operation of HIsmelt will comprise biochar, sourced from waste biomass and produced mostly by the palm-oil industry, in Malaysia, and possibly augmented by additional waste biomass from other sources.

The project will need to be subjected to thorough prefeasibility and feasibility studies. Further, permitting, approvals, and engineering design will be required before construction and commissioning can proceed.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Magnum is working closely with Midmetal to establish funding for the project. The study estimates capital expenditure of $410-million in the base case and an additional $82.4-million for the biochar facility, in Malaysia.

Planned Start/End Date
Not stated

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Magnum Mining & Exploration, tel +61 8 6408 0699 or email info@mmel.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION