Copper World Complex, US

24th November 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Copper World Complex.

Location
Arizona, in the US.

Project Owner/s
Base metals miner Hudbay Minerals.

Project Description
The results of a September 2023 enhanced prefeasibility study (PFS) for Phase 1 of the project has significantly enhanced the economics and derisks the project through higher levels of engineering, a simplified project design, lower upfront capital expenditure and a longer mine life.

Copper World is planned to be a traditional openpit truck-and-shovel operation, with a conventional flotation concentrator producing copper concentrate and molybdenum concentrate, with an expansion of the processing facility to include a copper concentrate leach facility in Year 5, producing copper cathode and silver/gold doré.

The overall mining operation is expected to comprise four openpits in Phase 1.

The mine plan for Phase 1 is optimised solely on the flotation of copper sulphides and oxides.

Phase 1 envisages a standalone operation with life of mine (LoM) of 20 years, four years longer than the Phase 1 LoM presented in the preliminary economic assessment that was published in June 2022. This is owing to an increase in the capacity for tailings and waste deposition, as a result of optimising the site layout.

The first phase of the project proposes average copper production of 85 000 t/y over the LoM. A variable cutoff-grade strategy allows for higher mill head grades in the first ten years and increases production to about 92 000 t/y of copper.

Phase 2 is expected to involve an expansion on to federal lands, with an extended LoM and enhanced project economics.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Phase 1 has an estimated after-tax net present value, at an 8% discount rate, of $1.1-billion and an internal rate of return of 19.2%, with a payback of 5.9 years at $3.75/lb copper.

Capital Expenditure
Total initial capital costs are estimated at $1.3 billion for Phase 1, including all costs associated with the construction of the concentrator and associated infrastructure.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Hudbay Minerals, tel +1 416 362 8181 or email info@hudbayminerals.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION