About 70% of total tonnes mined at Devon, reports GME
JOHANNESBURG (miningweekly.com) – Since starting production at its 100% owned Devon gold mine, in Western Australia, ASX-listed junior developer GME Resources has mined about 70% of the total tonnes, including waste and ore.
The company revealed on Thursday that four batches of ore – equating to 26 300 dry tonnes, or 40% of the total ore – had been processed at the Saracens Carosue dam project.
Sale of gold ore from the first batch had been finalised and provisional assay results had been calculated for the second batch. Both batches were processed in April.
Head grade assay results for the third and fourth batches, which were processed in May, WERE pending.
GME noted that mining over the next two weeks would focus on removing the western wall waste from the main pit floor, which was 22 m below surface. Once completed, the stripping ratios would be significantly reduced, enabling the pit to be developed to a maximum depth of 45 m.
GME planned to mine another 34 600 t of high-grade gold over the next six weeks, representing 60% of the total contained gold estimated within the final pit design.
Mining progress and costs were on target.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation