Creamer Media’s Engineering News Online
Advanced Search
 
 
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
GOLD 1382.45 $/ozChange: -5.72
PLATINUM 1433.00 $/ozChange: -18.00
R/$ exchange 9.99Change: -0.01
R/€ exchange 13.34Change: -0.05
 
Send to Friend
 
 Address to refer: http://www.engineeringnews.co.za/article/first-power-from-300-mw-botswana-coal-fired-ipp-expected-in-2013-2010-09-03
 Article Headline: First power from 300-MW Botswana coal-fired IPP expected in 2013
 Abstract: A tariff offer and a draft power purchase agreement (PPA) for a proposed term of 30 years for the planned 300-MW Mookane domestic power project, which could be developed at a cost of some US$800-million in Botswana, have been submitted to the Botswana Power Corporation (BPC) by the project's Chinese and Canadian developers. The power station would be Botswana's first private, base-load independent power producer and could begin production by the middle of 2013.
 Your Name:
 Your e-mail:
 Your colleague's e-mail: - separate emails by commas, maximum limit of 4 addresses
 A personal note:
 

Please enter the letters you see in the image below
Verification Image. Please refresh the page if
                              you cannot see this
                              image.