Stones field offshore installation project, US
Name and Location
Stones field offshore installation project, US.
Client
Shell Offshore.
Project Description
The project involves the development of subsea infrastructure for the Stones field, located in the Walker Ridge area, in the US Gulf of Mexico, at a water depth of about 2 900 m. This development will host the deepest floating, production, storage and offloading (FPSO) unit in the world and will be Shell’s first FPSO unit in the Gulf of Mexico.
Value
Not stated.
Duration
The offshore installation is expected to be performed in the second half of 2014.
Latest Developments
Technip has been awarded an engineering, procurement and installation contract by Shell Offshore for the development of subsea infrastructure for the Stones field.
Technip will be in charge of the installation of the subsea production system and the lateral gas pipeline at the Stones field, inclusive of associated project management, engineering and stalk fabrication.
The company’s operating centre, in Houston, Texas, will be responsible for the overall project management. The flowlines and risers will be welded at Technip’s spoolbase in Mobile, Alabama. The offshore installation is expected to be performed by the Deep Blue, Technip’s deepwater pipelaying vessel.
Key Contracts and Suppliers
Technip (engineering, procurement and installation contract).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Shell, tel +31 70 377 9111.
Technip public relations, Christophe Bélorgeot, tel +33 1 47 78 39 92 or
email press@technip.com.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation