Resolute's gold production drops in Sept quarter

18th October 2013

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Gold miner Resolute has reported a significant decline in production during the three months to September as its Syama operation, in Mali, underwent a major maintenance shutdown in July.

Gold production for the quarter under review declined to 84 274 oz, compared with the 102 685 oz in the June quarter.

The Syama mine produced 28 611 oz during the three months to September, compared with the 51 382 oz produced in the previous quarter. Throughput and production ounces were lower owing to the planned maintenance shutdown on the roaster circuit, which also resulted in cash costs for the operation increasing to $1 085/oz during the quarter.

At the Ravenswood mine, in Australia, gold production rose to 39 051 oz from 34 395 oz in the previous three months. The increase in gold production was ascribed to higher production and grade from the Mount Wright underground operation, as well as an increase in milled tonnes.

At the Golden Pride mine, in Tanzania, Resolute produced 16 612 oz of gold in the period under review, which was on par with the 16 808 oz delivered in the June quarter.

Gold production at Golden Pride would remain at similar levels over the December quarter, with continued high throughput offsetting the marginally lower grades.

Resolute kept its production guidance for the full year unchanged at 345 000 oz, at an average cash cost of A$890/oz.

Meanwhile, gold sales during the quarter came to 106 200 oz. The volume of gold sold was greater than the total production, owing to the sale of gold bullion on hand at the start of the quarter.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION