Medupi power station project, South Africa

11th April 2014

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Medupi power station project, Limpopo, South Africa.

Client
Eskom.

Project Description
Medupi is located on an 883 ha site in Lephalale, Limpopo.  It will be a dry-cooled coal-fired, baseload power-generating plant, comprising six 800 MW units, with a 4 800 MW installed capacity. It will be the fourth-largest coal plant in the southern hemisphere and the biggest of its kind with dry cooling in the world.

The planned operational life of the station is 50 years.

The power station will use high-tech supercritical boilers, which will operate at higher temperatures and pressures than older boilers, thereby providing greater efficiency.

It is the first baseload coal-fired station to be built in South Africa in more than 20 years and its delivery on schedule is viewed as critical.

The project is unique because Medupi is being built backwards – traditionally Eskom has always started building Unit 1 and ended with Unit 6. This new approach is the result of the rock conglomeration on the southern side, which is excavated and reused as the engineering fill on the northern side.

The project will form part of the utility's integrated strategic electricity plan and is designed to be flue-gas desulphurisation (FGD) ready.

Value
The cost of the project has increased from R91.2-billion to R105-billion.

Duration
Construction activities started in May 2007.  The first unit, Unit 6, will be synchronised to the grid in the second half of 2014.

Latest Developments

Eskom reports in its March New Build News that there have been challenges as a result of high rainfall impacting on production progress. Fortunately, work on Unit 6 has not been affected, as the unit is fully enclosed.

The following progress was reported in March:
• All 64 air-cooled condenser fans on Unit 6 have been commissioned and are undergoing optimisation.
• Two of the three boiler feed pump motors were started and tested on March 1, 2014.
• Unit 6 control and instrumentation cabling installation is still improving, with a continuous upwards trend in most areas.
• The Unit 6 boiler reheater welds are complete and ready for inspection.
• Eskom’s northern grid secondary plant transmission team has completed the commissioning of all the 400 kV busbars in the Medupi high-voltage yard. The works involved the commissioning of three 400 kV bus section bays, a 1 400 kV bus coupler bay and the 400 kV transfer coupler bay. The high-voltage transmission yard is ready for the commissioning of the Spitskop 1 and 2 feeder bays, which will be commissioned as soon as the minor remedial works on the 400 kV overhead lines have been completed.
• The separators are in place, with welding 89% complete. The purpose of the separator is to separate the steam and steam water droplets.
• Turbine works – commissioning of the motors at boiler feed pumps 11 and 12 motors’ has started, with the direction test complete.
• The incoming coal system from the 10 000 t coal silo is operational. The under-silo feeder conveyors at the silo have been successfully commissioned together with the direct current supplies in January. Although the system is live, no coal will be transported to the coal stockyard until the successful commissioning of the stacker and the repairs on the eastern seasonal stockpile have been completed.
• Work on the auxiliary boilers is 97% complete.
• Total auxiliary cooling system commissioning is 97% complete.
• Water treatment plant phase 1 commissioning is 60% complete.

Key Contracts and Suppliers
Main packages:
Parsons Brinckerhoff (execution partner); Roshcon (enabling civils); Rula Bulk Material Handling (coal overland conveyor and ash dump conveyor); Hitachi Power Africa (boiler); Alstom S&E Africa (turbine); LP Services consortium (engineering, procurement and construction contract for the low-pressure services); Ovivo Aqua SA (water treatment plant); Karrena-Concor joint venture, or JV (chimneys and silos); MPS JV (main civils); Actom (electrical power installation); General Electric (low-voltage switchgear system); Actom (medium-voltage switchgear); Siemens (auxiliary transformers and generator transformers); Standby Systems (UPS); Alstom C&I (C&I); Honeywell Automation and Control Solutions South Africa (CBMS); T-Systems (information technology (IT) and IT infrastructure); Siemens ACI Open Consortium (laboratory and analysers); Civcon/G4 JV (miscellaneous infrastructure and reservoirs); Basil Read (buildings Phase 2, ash dump infrastructure and clarifiers); NCI (diesel generators); ThyssenKrupp Materials Handling (coal stockyard equipment); Clyde Bergemann Africa (dust handling and conditioning systems); ELB Engineering Services (terrace coal and ash); Aveng Grinaker-LTA (buildings phase 1 and 3) and Tubular (supply and erection of conveyors).

On budget and on time?
The project will meet the revised end-of-year deadline for the flow of first power and will cost R105-billion, excluding indirect costs.

Contact Details for Project Information
Eskom project manager Roman Crookes, email roman.crookes@eskom.co.za
Eskom media desk, email mediadesk@eskom.co.za

Main packages:
Parsons Brinckerhoff, tel +27 11 787 4141, fax +27 11 886 0359 or email project@pbworld.com.
Roshcon, tel +27 11 629 8000 or fax +27 11 626 3460.
Rula Bulk Materials Handling, tel +27 11 795 1040, fax +27 11 795 1004 or email info@rula.co.za.
Ovivo Aqua SA, tel +27 11 886 0266.
Actom, tel +27 11 820 5111 or fax +27 11 820 5100.
GE corporate investor communications, tel +1 203 373 2460.
Siemens, tel +27 11 652 2000 or fax +27 11 652 2711.
Standby Systems, tel +27 861 782 632, fax +27 11 794 3598 or email standbypower@mweb.co.za.
Honeywell Automation and Control Solutions South Africa, tel +27 11 695 8000 or fax +27 11 805 1554.
Civcon/G4 JV, tel  +27 11 206 9660, fax +27 11 316 6604 or email info@civcon.co.za; tel +27 11 396 1793, fax +27 11 396 2344 or email info@g4.co.za.
Basil Read, tel +27 11 418 6300 or fax +27 11 418 6333.
NCI, tel +27 21 553 8840, fax +27 21 553 8841 or email info@nci-sa.co.za.
ThyssenKrupp Materials Handling, tel +27 11 236 1000, fax +27 11 236 1235 or email info.tkmh@thyssenkrupp.com.
Clyde Bergemann Africa, tel +2 7 11 704 0580, fax +27 11 704 0597 or email enquiry@cbz.co.za.
ELB Engineering Services, tel +27 11 772 1400, fax +27 11 325 6680 or email sales@elb.co.za.
Aveng Grinaker LTA, tel +27 11 578 6000 or fax +27 11 578 6161.

Other contractors:
a.b.e. Construction Chemicals, tel +27 11 306 9000.
Afrimat investor and corporate relations, tel +27 11 325 5944 or fax +27 11 325 5942.
BKS Group, tel +27 12 421 3500, fax +27 12 421 3501 or email group@bks.co.za.
DSE Structural Engineers & Contractors, tel +27 11 871 4111, fax +27 11 871 4141 or email dse@grinaker-lta.co.za.
Exxaro Resources, tel +27 12 307 4189.
GEA Aircooled Systems, tel +27 11 861 1521.
Genrec Engineering, tel +27 11 876 2300, fax +27 11 827 1733 or email sales@genreceng.co.za.
Hansen Transmissions, tel +27 11 571 9611.
HPA, tel +27 11 260 4300, fax +27 11 656 3609 or email info@hitachi-power.co.za; or media liaison Pamella Radebe, tel +27 11 260 4300 or email p_radebe@hitachi-power.co.za.
HPE, tel +49 203 80 38 0 or fax +49 203 80 38 1809.
Kwikspace, tel +27 11 903 8993 or email barney@kwikspace.co.za.
IWC, tel +27 11 466 0699, fax +27 11 466 8180 or email mail@iwc.co.za.
Lesedi Nuclear Services, tel +27 21 525 1300 or fax +27 21 525 1333.
Mikropul, tel +27 478 0456, fax +27 478 0371 or email sales@mikropul.co.za.
Murray & Roberts, tel +27 11 723 2080.
Royal HaskoningDHV, tel +27 11 798 6000, fax +27 11 798 6005 or email corporate@rhdhv.com.
Sarens, tel +27 11 861 3800, fax +27 11 861 3899 or email info@sarenssa.co.za.
SSD, tel +27 11 828 0439 or fax +27 11 828 2810.
Steloy Castings, tel +27 13 933 3331, fax +27 13 933 3653 or email info@steloy.com.
Sulzer Pumps South Africa, tel +27 11 820 6252 or fax +27 11 820 6205.
TKMH, tel +27 11 236 1000 or fax +27 11 236 1235.
Tubular, tel +27 11 553 2000, fax +27 11 450 2160 or email th@tubular.co.za.
Voith Turbo, tel +27 11 418 4076 or fax +27 11 418 4059.
Wetback Contracts, tel +27 11 392 8000, fax +27 11 392 5856 or email info@wetback.co.za.
Lighting Structures, tel +27 87 310 1000, fax +27 86 699 6999.
Konecranes, tel +27 11 864 2800.
Wade Walker, tel +27 11 466 0377.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION