Name and Location
Layang field development project, Sarawak, Malaysia.

Client
JX Nippon Oil & Gas Exploration Corporation (75%) and Petronas Carigali (25%).

Project Description
The Layang field is located in Block SK10 off the shore of Malayasia at a water depth of 85 m and about 8 km east of the producing Helang gasfield, in the same block.

The development of the Layang field involves the installation of a floating production, storage and offloading system (FPSO). The initial estimated incremental production of Helang/Layang gas is expected to be about 100-million standard cubic feet a day and Helang condensate/Layang oil/Layang condensate to be about 7 000 bbl/d.

Natural gas produced from the Layang field and Helang gasfields is planned to be supplied through 200-km-long subsea pipelines to Malaysia LNG Tiga’s liquefaction plant, in Bintulu, Sarawak.

The natural gas will be sold as liquefied natural gas after liquefaction, while the condensate and Layang oil is planned to be shipped from the FPSO.

Value
Not stated.

Duration
Commercial production from the field is expected to start in the second quarter of 2016.

Latest Developments
JX Nippon Oil & Gas Exploration has awarded Technip a subsea contract in the Layang field. The contract covers the engineering, procurement, fabrication, installation and commissioning of three flexible pipes totalling 9.9 km. The flexible pipes consist of two production risers and flowlines and one gas export riser and flowline, connecting shallow water platforms to the new FPSO.

Technip’s operating centre in Kuala Lumpur, Malaysia, will execute the contract, while the flexible flowlines will be produced at Asiaflex Products, Technip’s manufacturing facility in Tanjung Langsat, Johor, Malaysia.

The installation campaign will use the group’s multipurpose vessel, the Deep Orient. The project is scheduled to be completed in the second half of 2016.

Key Contracts and Suppliers
Technip (engineering, procurement, fabrication, installation and commissioning of flexible pipes).

On Budget and on Time?
Not stated.

Contact Details for Project Information
JX Nippon Oil & Gas Exploration Corporation, tel +81 3 6275 5241 or fax +81 3 3276 1361.
Technip public relations manager Laure Montcel, tel +33 1 49 01 87 81.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION