Gas turbine combined-cycle power generation plant project, Japan
Name and Location
Gas turbine combined-cycle (GTCC) power generation plant project, Japan.
Client
Hokuriku Electric Power Company.
Project Description
The project involves the construction of a 427 MW natural-gas-fired GTCC power generation plant at Hokuriku Electric Power Company’s Toyama Shinko thermal power station.
GTCC power plants generate electricity in two stages through gas and steam turbines, with high-temperature exhaust from the gas turbine used to produce the steam that drives the steam turbine.
Value
Not stated.
Duration
The power plant is slated to go on stream in 2018/19.
Latest Developments
A consortium, comprising Mitsubishi Hitachi Power Systems (MHPS) and Mitsubishi Electric Corporation, has received an order to build a 427 MW natural-gas-fired GTCC.
The GTCC power plant on order will primarily consist of an M501GAC gas turbine, an SRT-50 steam turbine, a heat-recovery steam generator and a generator.
MHPS will be responsible for manufacture, supply and installation of the gas and steam turbines.
Key Contracts and Suppliers
Mitsubishi Hitachi Power Systems and Mitsubishi Electric Corporation (GTCC construction).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Hokuriku Electric Power Company, tel +81 76 441 2511 or fax +81 76 405 0103.
MHPS, tel +81 45 200 6100.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation