Polcevera river bridge, Italy

10th January 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Polcevera river bridge.

Location
Genoa, Italy.

Project Owner/s
Autostrade.

Project Description
The bridge over the Polcevera connects the Port of Genoa and the wider coastal area to France. The bridge collapsed in August 2017.

The new bridge will play an important role in Genoa’s returning to being an important shipping and commercial hub. It will have a continuous 1 067-m-long steel deck with 20 spans.

It will have 19 elliptical piers made of reinforced concrete, the majority of which are positioned 50 m from each other. Two of the piers will be 100 m from each other because of their location on the river and the railway.

The design takes into account that the bridge crosses a densely populated area.

Potential Job Creation
None stated.

Capital Expenditure
Not stated.

Planned Start/End Date
The project is expected to take 12 months to complete, which will start after the demolition of the old bridge.

Latest Developments
Salini-Impregilo has reported that the bridge is taking shape, with the raising of the first section of the deck on the east side between Piers 14 and 15, in Camposso Park – the area that suffered the most from the collapse of the original Morandi bridge in 2018.

Work is progressing on the completion of three more piers following the installation of the first ten. Assembly of the next sections for the west and east sides of the deck is also under way.

Key Contracts and Suppliers
Pergenova, a joint venture between Salini Impregilo and Fincantieri Infrastructure (construction contract).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Autostrade, email info@autostrade.com.

 

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION