NexGen embarks on winter exploration programme for Rook I

30th January 2018

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Uranium explorer NexGen Energy has started work on its winter 2018 drill programme at the fully owned Rook I property, in the Athabasca basin of Saskatchewan.

The winter 2018 programme will comprise about 25 000 m using eight drill rigs.

Key objectives include testing the Arrow Deposit's A3 high-grade zone definition, targeting the large untested areas surrounding the A1 to A5 shears; potential extensions of the shears, particularly to the north east; and definition of the newly discovered high-grade mineralisation northwest of the A1 shear.

At South Arrow, drilling will continue to focus on defining the extent of uranium mineralisation in all directions. Further, highly ranked geophysical targets on the Arrow, South Arrow and Mirror conductors will also be targeted owing to results of geophysical surveys conducted mainly in 2016 and 2017.

Meanwhile, NexGen is continuing work on prefeasibility-stage technical studies, including geotechnical work, hydrogeological work and metallurgy as the company works towards publishing a maiden prefeasibility study by the third quarter this year.

"The winter 2018 drilling will focus on testing in areas that hold high potential for additional mineralised shears, extensions of existing mineralised shears and new high-grade sub zones in close proximity to Arrow. Further, drilling at South Arrow, located 400 m south of Arrow, will continue to focus on determining the extent of mineralisation discovered in 2017," stated CEO Leigh Curyer in a news release.

He added that NexGen would start to test highly ranked geophysical targets within a 2 km radius of Arrow and along the Patterson Corridor, which is largely unexplored on Rook I, yet hosts four known uranium mineralised zones. 

NexGen also reported cash in the bank of C$155-million.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION