Earthlife’s application to stop nuclear waste smelter construction fails

8th March 2017

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

Environmental activist organisation Earthlife Africa has lost a court application against the South African Nuclear Energy Corporation (Necsa) to stop the construction and use of a small nuclear waste smelter.

On Tuesday, Judge Pierre Rabie dismissed Earthlife’s application in the High Court in Pretoria to set aside the authorisation for Necsa to operate the smelter.

Earthlife believed radioactive gases would be emitted from the smelter’s stack and, as such, appealed against the building of the smelter.

“I am really pleased at this most sensible outcome. Earthlife Africa has consistently refused to listen to any reason and has pursued this action as part of its ongoing attitude of obstruction of Necsa’s activities at every opportunity,” Necsa chairperson Dr Kelvin Kemm said.

According to stringent nuclear handling protocols, various items, such as pipes and metal fittings, which have been used in a nuclear process, must be cleaned, checked for residual radiation and then safely stored.

Such metal components are subjected to a thorough chemical cleaning process to remove radioactive dust, sludge or other contaminants. Necsa carries this out within a sealed environment.

However, owing to sharp angles in this metal, such as screw threads and machined grooves, the chemical cleaning cannot remove 100% of potential radioactive contaminant.

The ‘waste’ pipes and fittings are stored in a secure area, after chemical cleaning.  Such metal parts, collected over many years, were filling up the storage area.

Necsa decided that to create more storage space, until now occupied by these pipes and parts, the waste components would be melted down to solid blocks of metal, with a “sophisticated smelting system”.

This system not only melts the metal but also removes 98% of any uranium which may still remain on the metal, Necsa said.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION