Western Cape govt aiming to complete key road upgrades in 2020

8th February 2019

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

The Western Cape Department of Transport and Public Works (DTPW) reports that its R182-million project to upgrade the R102 between Hartenbos and the Great Brak River, as well as the DR1578 between Tergniet and Wolwedans, will be completed by mid-2020.

A number of construction activities are being undertaken simultaneously, with stop/go controls implemented to manage the flow of traffic where necessary, the department added.

The stop/go controls will be reintroduced on the R102 between the Long street intersection at De Dekke, in Great Brak River, and Tergniet to allow half-width construction. Both lanes would be reopened by mid-March 2020, the DTPW confirmed.

Additionally, stop/go controls will be put in place on the DR1578 road between the N2 bridge crossing and the Freimersheim road intersection. Both lanes will be reopened by mid-March 2020.

The DTPW has also advised that the stop/go signs would be necessary when the upgrading of the link road between Impala road and the R102, at Tergniet, begins, as well as when the Impala road and R102 intersection at Fraaiuitsig are upgraded.

When the reconstruction of the R102 between the new culvert at Riverside and the T-junction begins, stop/go signs will also be implemented.

With regard to road closures, the DTPW noted last week that the road between the Monte Christo intersection and Riverside would be closed for remedial works on the Little Brak River bridge.

Only local access will be permitted for the Swans Nursery and the people living along the south bank of the little Brak River.

It is expected that this road will be reopened by mid-June.

The R102 between the Tergniet and Impala road intersections at Fraaiuitsig will also be closed for roadworks, with local access permitted for residents of Rheebok Village Estate and Groenkloof.

It is expected that this road will be reopened by mid-March.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION