Virginia gas project, South Africa

30th October 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Virginia gas project.

Location
The project spans 187 000 ha of gasfields across Welkom, Virginia and Theunissen, in the Free State, in South Africa.

Project Owner/s
Tetra4, a subsidiary of Renergen.

Project Description
The project entails the construction of 52 km of gas-gathering pipeline and cryogenic liquefaction processing facilities.

The aim is to produce all South Africa’s helium requirements and potentially export the balance of production, as well as produce the first liquefied natural gas (LNG) locally available for commercial consumption.

Phase 1 aims to produce 350 kg/d of helium. Output will be increased to up to 10 000 kg/d of helium in Phase 2, “arguably making it among the biggest helium projects on the planet", CEO Stefano Marani has said. This will result in 0.7-billion cubic feet (bcf), which over 19 years amounts to 13.87 bcf, or 4%, of the 344 bcf prospective resource.

Renergen is also in the construction phase of South Africa’s first commercial LNG plant.

Phase 1 of the project will produce about 50 t/d of LNG, which is about 75 000 ℓ/d of diesel equivalent. Phase 2 will potentially increase this to the LNG equivalent of about 300 000 ℓ/d of diesel.

Phase 2 allocations will likely result in the project’s transforming into a significant LNG production facility, placing the project more in line with global small-scale production capabilities.

Phase 2 is intended to be completed by late 2023, by which time more than 150 wells would have been added.

Potential Job Creation
Despite the project’s size relative to traditional mining operations, it will create an estimated 360 temporary jobs during development and construction, and an estimated 82 permanent jobs once all the clusters have been developed.

Capital Expenditure
The total projected capital expenditure to roll out the first phase of production is estimated at R750-million, which includes the cryogenic liquefiers.

Planned Start/End Date
Phase 1 of the Virginia project is expected to start producing LNG and liquid helium by 2021. Phase 2 is expected to complete construction in 2023 or 2024.

Latest Developments
Renergen’s re-drill of the inclined drilling programme (referred to as P2V2) at its flagship Virginia gas project is expected to be at, or close to, target by the end of the first week of November.

In a statement released on October 21, the company confirmed that the re-drill had completed setting (of) the intermediate casing and that it was on track to drill through to the base of the Karoo and the targeted gas-bearing fault structures.

The first well in the programme had to be abandoned, owing to the loss of equipment downhole.

A second drilling rig was mobilised (and is expected to mobilise) to site on October 26 and is expected to start operations on October 30. This rig has directional capability and will re-enter an old, cased exploration hole close to a known gas-bearing fault.

Getting the drilling programme back on track reduced time and costs significantly, Renergen CEO Stefano Marani has said.

Being within close proximity to the gas-bearing faults has created an opportunity for the company to not only bring the additional flow online but also obtain important new geological data, he adds.

Key Contracts, Suppliers and Consultant
Sproule (formerly MHA Petroleum – helium reserve independent expert report) and VGI (owner’s engineer with regard to the engineering and procurement phase of the project).

EPCM Bonisana (gas gathering work), a subsidiary of EPCM Holdings (EPC contractor).

Western Shell Cryogenic Equipment (technology and equipment), and Bohrmeister Technik (Phase 1 – drilling contract).

Contact Details for Project Information
Renergen, tel +27 10 045 6000, email info@renergen.co.za or investorrelations@renergen.co.za.

 

Edited by Creamer Media Reporter

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024
Photo of Martin Creamer
On-The-Air (10/05/2024)
10th May 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.247 0.316s - 167pq - 2rq
Subscribe Now