https://www.engineeringnews.co.za
Copper|Mining|PROJECT|Resources
Copper|Mining|PROJECT|Resources
copper|mining|project|resources

Tiger says DRC plant on track to reach 25 000 t/y capacity

Tiger says DRC plant on track to reach 25 000 t/y capacity

Photo by Reuters

31st July 2014

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Copper miner Tiger Resources produced 1 499 t of copper cathode during its first production quarter, which ended in June.

Copper cathode production started in May this year, at the Stage 2 solvent extraction electrowinning (SX-EW) plant at its Kipoi project, in the Democratic Republic of Congo.

The SX-EW plant was on track to achieve a nameplate capacity of 25 000 t/y of copper cathode in August, Tiger said on Thursday.

During the quarter under review, 281 421 t of material was moved to deliver 177 868 t of high-grade ore averaging 5.2% copper and 22 866 t of medium- and low-grade ore averaging 1.4% copper to the run-of-mine stockpile.

Mining activities have now ceased from the Stage 1 heavy media separation (HMS) pit, and Tiger said that these would only restart in 2016, when the Stage 2 SX-EW operation depleted the current stockpiles.

Meanwhile, copper-in-concentrate production during the quarter under review reached 5 093 t, compared with the 6 518 t produced in the previous quarter, with the lower production owing to a slight decline in head-grade and recovery during the second quarter.

Tiger’s current operating plan was to shut down the production of copper concentrate on the depletion of high sulphur/silica-oxide ore stockpiles during the first quarter of 2015. The HMS plant would then be reconfigured to produce heap leach feed for the SX-EW from the medium-grade stockpile.

The copper miner said that the company would continue to review the HMS plant performance and the reconfiguration to produce heap leach feed for the SX-EW, which could be brought forward to increase copper production and efficiencies, and to improve shareholder returns.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.084 0.139s - 158pq - 2rq
Subscribe Now