https://www.engineeringnews.co.za
Cable|Construction|Energy|Environment|Excavator|MB Crusher|Pipes|Power|PROJECT|Renewable Energy|Renewable-Energy|Safety|SECURITY|System|Technology|Tubes|Underground|Environmental|Cables
Cable|Construction|Energy|Environment|Excavator|MB Crusher|Pipes|Power|PROJECT|Renewable Energy|Renewable-Energy|Safety|SECURITY|System|Technology|Tubes|Underground|Environmental|Cables
cable|construction|energy|environment|excavator|mb-crusher|pipes|power|project|renewable-energy|renewable-energy-company|safety|security|system|technology|tubes|underground|environmental|cables

The Power That Runs Within

19th September 2019

     

Font size: - +

This article has been supplied as a media statement and is not written by Creamer Media. It may be available only for a limited time on this website.

Wahle-Mecklar  (0.14 MB)

A shafts screener MB-HDS is involved in the Wahle-Mecklar ground–friendly project in Germany

What A Debut

In Wartjenstedt (Baddeckenstedt), Germany took place the first test of the Wahle-Mecklar project, that saw the use of alternative technologies to underground high-voltage cables, a shafts screener MB-HDS was in the spotlight.

Last 9th of July, in front of political representative, media, several associations and farmers, the (TSO)TSCNET TenneT a Dutch-German electricity transmission system operator, demonstrated how to bury high voltage cables at a lower cost, faster time and above all minimizing environmental impact.

How? Well, simply by using green technology. In fact, a new special ram drove the empty ducts into the ground and a shafts screener MB-HDS320 covered it. MB Crusher unit was chosen because of its peculiarity of being able to change the shafts directly on-site according to the type of material that needs to be treated. 
 

The Wahle-mecklar Project And The Wartjenstedt Test

This pilot project for burying high voltage cables is required by the German law on the expansion of the electricity grid  (Gesetz zum Ausbau von Energieleitungen - EnLAG).  After more than 10 years planning this 230 km of underground power lines at a voltage of 380 Kilovolts (kV) will connect the transformation substation in Wahle bei Braunschweig in Lower Saxony with the one in Mecklar bei Ludwigsau in Hesse, hence the name Wahle-Mecklar.

The purpose is to significantly increase the capacity, stability and security of the grid supply in Germany and also to meet the ever-increasing demand for renewable energy.

The peculiarity of the project lies in the need to comply with the necessity of laying the cables underground to avoid depreciation due to electromagnetic fields, abstain from the loss of property value and possible negative effect on environment and countryside. However, as well as reduce the environmental impact the project must also be of rapid execution.

Ground-friendly Technology And The Mb Shafts Screener

Until now to underground high voltage cables, it was necessary to do huge excavations with the high deployment of machinery, workforce and time.

The Wartjenstedt test, however, has demonstrated that cable grounding is possible with minor disarrangement of the existing soil structure, halving costs and construction times at the same time. The test was carried out for a length of about 200 meters by laying the pipes for 380kV three-phase power cables.


A ground-friendly process that minimised excavation.  The rich topsoil is removed and stored on-site. A special ram dug a duct for each of the three tubes, a trench 120cm wide. At the same time, the machinery placed the cables directly in the ground.

Thereafter the MB-HDS shafts screener, installed on a Volvo EC250E NL excavator, sifted the dug soil directly above the trench, the excavation is filled with the same screened material of which is composed. The environment remains intact, the work is done quickly while the pipes are laid.

The MB-HDS shafts screener is designed to interchange the rotating shafts directly on-site and in complete safety, in just a few minutes by a single person. This innovative system is made up of a stand that will keep the rotating shafts in place, making it easy to extract and exchange them. In practice, it means having the yard always in action. 

Edited by Creamer Media Reporter

Comments

Showroom

Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.074 0.13s - 164pq - 2rq
Subscribe Now