https://www.engineeringnews.co.za
Cable|Electrical|Fire|Flow|Installation|Lighting|PROJECT|Scaffolding|Service|skyriders|Steel|System|Flow|Maintenance|Cables
Cable|Electrical|Fire|Flow|Installation|Lighting|PROJECT|Scaffolding|Service|skyriders|Steel|System|Flow|Maintenance|Cables
cable|electrical|fire|flow-company|installation|lighting|project|scaffolding|service|skyriders|steel|system|flow-industry-term|maintenance|cables

Skyriders completes waterproofing project at Tramshed in Pretoria

28th November 2019

     

Font size: - +

This article has been supplied as a media statement and is not written by Creamer Media. It may be available only for a limited time on this website.

Skyriders  (0.06 MB)

Rope-access specialist Skyriders recently assisted with a six-day waterproofing project at the Tramshed Shopping Centre in Pretoria. A four-person team used basic rope access and fall arrest principles to identify problematic areas on the roof and external walls, including jointing.

The shopping centre decided on the proactive maintenance project in order to prevent any future problems or damage resulting from inadequate waterproofing, Skyriders Marketing Manager Mike Zinn explains.

The rope-access team was required to apply a Sika waterproofing membrane on certain brickwork areas. The fact that Skyriders mainly worked on the roof and exterior minimised disruption to the fully operational shopping centre.

In addition, the company was called upon to assist with the installation of cable trays and piping for a back-up genset system in a confined-space service shaft. Skyriders can also can sub-contract a specialist if more technical at-height electrical work is required.

Skyriders is no stranger to the retail industry, having deployed netting platforms and rope access for maintenance and repair work at the Greenstone Shopping Centre in Johannesburg. Firstly, technicians entered the mall’s ceiling workspace to remove all dangerous and loose materials, in order to allow safe access for contractors.

Phase Two saw the installation of a temporary work platform system consisting of steel cables and heavy-duty nets. The netting system enabled specialised ceiling, fire protection, lighting and electrical contractors to access the affected areas.

The temporary work platform system was an ideal solution, as hanging scaffolding could not be used on-site due to the weight constraints, while erecting scaffolding from the ground up was also not viable, as this would have restricted the free flow of shoppers in the mall during the day.

Edited by Creamer Media Reporter

Comments

Projects

Image of Kenya map/flag
High Grand Falls dam, Kenya
Updated 2 hours 9 minutes ago By: Sheila Barradas

Latest News

Magazine cover image
Can South Africa turn around 30 years of real economy underperformance?
Updated 2 hours 15 minutes ago By: Terence Creamer

Showroom

Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.081 0.139s - 164pq - 2rq
Subscribe Now