https://www.engineeringnews.co.za

Joburg’s Rea Vaya not yet meeting targets as next phase moves ahead

RICE TAG The real costs of operating Rea Vaya have become clear

RICE TAG The real costs of operating Rea Vaya have become clear

Photo by Duane Daws

1st August 2014

By: Irma Venter

Creamer Media Senior Deputy Editor

  

Font size: - +

Phase 1A of Johannesburg’s Rea Vaya bus rapid transit (BRT) system should carry around 42 000 people a day, while it was been expected that Phase 1B, rolled out last year, would add another 60 000 daily passengers.

However, the entire system is currently carrying only 35 000 people per weekday on average, says Rea Vaya finance and administration director Brendan Petersen.

“This is much lower than anticipated”, and is “not economically efficient” when considering only the transport benefits, and not the social benefits.

If one looks at the time period November 2013 to June 2014, the Gautrain transported 48 000 people on average on a weekday, with minibus taxis moving one-million passengers a day, said Petersen.

“Are we getting value for our money?”

Government invested around R4-billion in the Rea Vaya bus system to date.

Petersen says it is important to consider a num-ber of questions, through a sustainability study, before the planned roll-out of Phase 1C in 2017.

The original objectives of the Rea Vaya system were to provide a fast, safe and reliable public transport system; formalise the minibus taxi industry through its participation in Rea Vaya; ensure spatial restructuring and integration, with the poor able to move around the city, ensuring a shift to public transport; mitigate climate change; and ensure Johannesburg became a more competitive city.

However, certain challenges have emerged in the operation of phase 1A and 1B.

For one, the real costs of operating Rea Vaya have become clear, says Petersen.

For example, the costs of station and travel-way maintenance are high, as is the price tag on staffing the stations, fuelled by passengers’ secu-rity concerns.

The city also realises that the system will need operational subsidies for most of the 12-year operating contracts.

The cost of automatic fare collection is high, while it has also become clear that the stations are not “fare-evasion proof”, notes Petersen.

The introduction of a bank-based card as a payment method, with loading fees, saw a “significant reduction” in passenger numbers, says Petersen. However, some of these passengers have now returned to the system, he adds.

“Our passengers are very sensitive to any small fare increases.”

Fare evasion took place when passengers left the station in free flow. Now, however, passengers tap their cards through a turnstile to leave, similar to the situation when they enter the station.

Strikes also see passengers leaving the system, returning only two . . . three months later.

The sustainability study on Phase 1C investi-gated a few scenarios, Petersen explains.

It considered not building Phase 1C; rolling out a BRT system similar to Phase 1A and 1B; improving and extending Phase 1C; or moving to light rail.

A number of indicators were considered, such as safety, basic accessibility, system efficiency, security, economic viability, resource con-sumption and air quality.

The city asked how operating costs could be covered by fare revenue, says Petersen, also considering options such as advertising at the stations.

The outcome of the study is that Phase 1C should be improved and extended beyond the scope of the original planning.

The original plan was for Phase 1C to go to Alexandra and Sandton. However, the extended Phase 1C will now go to Ivory Park, Midrand, Sunninghill and pos- sibly Randburg, in an effort to secure more passengers.

It is expected that the new extended Phase 1C could add 200 000 passengers a day.

Petersen expects Phase 1C to start operations in early 2017.

 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.082 0.144s - 157pq - 2rq
Subscribe Now