Name and Location
Koeberg nuclear power station steam-generator replacement project, Western Cape, South Africa.

Client
Eskom.

Project Description
The current steam generators in Unit 1 and Unit 2 at the Koeberg nuclear power station have been in operation since 1983/4 and 1984/5 respectively; as a result, Eskom plans to replace them.

This will involve the design, manufacture and installation of three steam generators in each of the two operating units, as well as the safety analyses and studies required for the replacement of the six steam generators.

The new generators will incorporate modern design features for easy maintenance and inspections, and improve heat-transfer efficiency, leading to the overall efficiency of the power station.

The installation of the generators will be conducted during the scheduled refuelling, inspections and maintenance outages of the two units at the power station.

Value
Eskom has stated that the outcome of current “commercial process” will determine the total cost of the project.

Duration
Based on the lead times for the manufacture of six new steam generators, Eskom is planning for installation to take place in 2018.

Latest Developments
France's Areva has won a contract to replace six steam generators at South Africa's Koeberg nuclear power plant.

The refit is part of a programme to install up to 9 600 MW of new nuclear power by 2030.

The new generators will be installed in 2018, Eskom has said.

Financial details of the refit have not been disclosed.

Key Contracts and Suppliers
Group Five and Lesedi Nuclear Services (design, manufacture and replacement of refuelling water storage tanks).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Eskom, tel +27 11 800 8111.
Group Five, tel +27 11 806 0111.
Lesedi Nuclear Services, tel + 27 21 525 1300 or fax +27 21 5251333.

Edited by Creamer Media Reporter

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.291 0.363s - 159pq - 2rq
Subscribe Now