Name of the Project
Kariba dam rehabilitation project.

Location
Zambia.

Client
Zambezi River Authority (ZRA) operates, maintains and manages the Kariba dam on behalf of the governments of Zambia and Zimbabwe.

Project Description
After 50 years of serving the Southern Africa region, the Kariba dam requires a series of rehabilitation works for its continued safe operation.

The structural integrity of the 55-year-old dam wall has been compromised through the years by erosion of the plunge pool, with the foundations chipped down to depths of up to 90 m beyond permissible levels through advanced alkali-silica reaction in the concrete.

The erosion has undercut and destabilised the wall, putting the entire wall structure at high risk of collapse. An expert report produced by the ZRA has also warned that a continuous swelling of the concrete wall, owing to slow chemical reactions over the years, is constricting the passage of water through the spill-ways. Such a constriction of the spillways could obstruct the reservoir’s water-level control systems and lead to an excessive build-up of pressure on the weak wall and potentially precipitate its collapse. Failure to invest in the timely rehabilitation of the dam will result in the gradual degradation of key safety features associated with the structure.

Rehabilitation measures include:
• the design, fabrication and installation of an emergency gate and a new gantry to prevent the uncontrolled loss of water in the event of floodgate failure, which will result in water levels dropping to below the minimum operating levels and interrupting power production;
• the refurbishment of the upstream stop-beam guides and the replacement of secondary concrete to prevent failure during the operation of stop-beams; and
• reshaping the plunge pool downstream of the dam to limit scouring and erosion that could potentially undermine the dam foundations, leading to dam failure.

The Kariba dam generates more than 1 830 MW of hydropower. The dam’s wall straddles Zambia and Zimbabwe.

Jobs to be Created
Not stated.

Value
As of April 2015, the total project cost was estimated at $294-million, which will be released in batches spread over the duration of the project.

The project is being funded by the European Union (EU), the World Bank, the African Development Bank (AfDB) and the government of Sweden.

Duration
The Kariba dam faces collapse if not repaired in three years.

Latest Developments
The Zambian and Zimbabwean governments, with the support of an EU delegation to Zambia, signed the plunge pool reshaping works contract at the dam wall on February 14.

The plunge pool reshaping is the first component of the Kariba dam rehabilitation project funded by the EU, World Bank, the AfDB and the government of Sweden, together with the ZRA.

Key Contracts and Suppliers
The EU, World Bank, AfDB and government of Sweden (loan finance).

On Budget and on Time?
Not stated.

Contact Details for Project InformationCopy Headline
ZRA public relations and communications manager Elizabeth Karonga, tel +260 211 230551 or email karonga@zaraho.org.zm.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Hanna Instruments Image
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.335 0.482s - 159pq - 2rq
Subscribe Now