Greater Tortue Ahmeyim project, Senegal – update

Image of Greater Tortue FPSO

Photo by bp

7th July 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Greater Tortue Ahmeyim (GTA) project.

Location
About 120 km offshore in a water depth of 2850 m, off the shore of Mauritania, and in the Saint-Louis Profond block, off the shore of Senegal.

Project Owner/s
A partnership comprising bp, Petrosen, Société Mauritanienne des Hydrocarbures and Kosmos Energy.

Project Description
The GTA project was granted the status of National Project of Strategic Importance by the Presidents of Mauritania and Senegal in July 2021.

Phase 1 of the GTA – currently under development – will export gas to a floating production storage and offloading (FPSO) facility about 40 km offshore, where the gas will be processed and liquids separated. The gas will be exported to floating LNG facilities 10 km offshore. It is expected to produce about 2.3-million tonnes of LNG a year when operations start.

Phase 2 will evaluate a gravity-based structure (GBS) as the basis for the project, with a total capacity of between 2.5-million and three-million tonnes a year.

GBS liquefied natural gas (LNG) developments have a static connection to the seabed.

The concept design will include new wells and subsea equipment, integrating with and expanding on existing GTA infrastructure.

The partnership will consider powering LNG liquefication using electricity to lower operational emissions.

Potential Job Creation
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Phase 2 is expected to be completed in 2027.

Latest Developments
As the first phase of the GTA gas project reaches 90% completion, Mauritania and Senegal are already looking ahead to Phase 2.

The approval of a new design, based on a GBS in February 2023, has provided the groundwork for Phase 2.

Ministry of Petroleum, Energy, and Mines of Mauritania adviser on the upstream sector Lehbib Khroumbaly has indicated that the Ministry plans to start Phase 2 in 2025, with total completion in 2027.

The FPSO from Singapore is expected to arrive in Mauritania’s waters in early July.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
bp press office, tel +44 20 7496 4076 or emailbppress@bp.com.
Kosmos Energy, tel +44 (203 954 2831 or email investor.relations@kosmosenergy.com.
Société Mauritanienne des Hydrocarbures, tel+222 525 59 93.
Petrosen, tel +221 33 839 92 98 or email petrosen@petrosen.sn.

Edited by Creamer Media Reporter

Comments

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.082 0.154s - 167pq - 2rq
Subscribe Now