https://www.engineeringnews.co.za
Africa|Construction|Energy|Eskom|Gas|Gas-to-power|generation|Infrastructure|Power|PROJECT|Projects|Resources|SECURITY|Services|Turbines|Power Generation|Power-generation|Infrastructure|Turbines
Africa|Construction|Energy|Eskom|Gas|Gas-to-power|generation|Infrastructure|Power|PROJECT|Projects|Resources|SECURITY|Services|Turbines|Power Generation|Power-generation|Infrastructure|Turbines
africa|construction|energy|eskom|gas|gas-to-power|generation|infrastructure|power|project|projects|resources|security|services|turbines-company|power-generation|power-generation-industry-term|infrastructure|turbines-person

Gas Independent Power Producer Procurement Programme – Bid Window 1, South Africa

Image of South Africa map/flag

1st March 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Gas Independent Power Producer Procurement Programme (GASIPPPP) – Bid Window 1 (BW1).

Location
The gas-to-power (GtP) facilities can be located anywhere within the borders of South Africa.

Project Owner/s
Department of Mineral Resources and Energy.

Project Description
Following the promulgation of the Integrated Resource Plan 2019 in October 2019, the Minister of Mineral Resources and Energy determined that the procurement of new-generation capacity is required to ensure energy security, and that about 3 000 MW would be generated from gas.

The GASIPPPP has been designed to procure  2 000 MW of new-generation capacity, including ancillary services and energy output, that will be derived from land-based gas-fired power generation facilities.

The remaining 1 000 MW has been reserved for a separate procurement process, which will be undertaken to establish new-generation capacity by one or more facilities, to be located in the area known as Zone 13, in the Coega Special Economic Zone, near the Port of Ngqura, in the Eastern Cape.

The GASIPPPP BW1 limits bidders to the construction of greenfield facilities, ruling out the conversion of the diesel-fuelled Avon and Dedisa open-cycle gas turbines to gas.

Projects can, however, share infrastructure with existing facilities, but such infrastructure must have unconditional and irrevocable rights in the shared infrastructure.

Plants of between 300 MW and 1 000 MW will be considered and they will be expected to operate at a maximum load commitment of 65% and a minimum of 40%, with State-owned power utility Eskom to dispatch the facility, in line with an agreed monthly load commitment.

The facilities, which will sell electricity to Eskom for 20 years, will be compensated for capacity, energy and ancillary services.

Potential Job Creation
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Independent power producer project officer, email Query@ipp-rm.co.za.
 

To watch Creamer Media's latest video reports, click here
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.094 0.166s - 165pq - 2rq
Subscribe Now