https://www.engineeringnews.co.za

Fresnillo cuts silver guidance, tweaks gold forecast

24th October 2018

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Despite reporting a 6.3% increase in third-quarter silver production, Mexican precious metals miner Fresnillo on Wednesday lowered its production forecast for the year, citing “continued challenges” at the Saucito and Fresnillo mines.

The London-listed company reported that the third quarter’s silver production failed to meet its expectations, prompting management to lower its guidance for the year to between 62-million ounces and 64.5-million ounces, from a previous guidance of 64.5-million ounces to 67.5-million ounces.

Fresnillo, however, marginally increased its gold production guidance to between 920 000 oz and 940 000 oz, from its previous guided range of 900 000 oz to 930 000 oz.

“Gold production continues to beat expectations and we are once again revising our guidance upwards following another strong quarter, in particular at our Saucito and Noche Buena mines where volumes exceed targets. Though silver production is up against all comparable periods, we are revising full year silver guidance following continued challenges at the Fresnillo and Saucito mines. These are world-class, tier-one silver assets, and we remain both determined, and confident, given the actions we are taking, that we will deliver a better performance in the last quarter and in 2019,” CEO Octavio Alvidrez said.

During the third quarter, silver production at the Fresnillo mine suffered as a result of limited access to higher grade areas, resulting from contractor-led delays in development and preparation. The company has appointed a new contractor, which has begun operating and said that this should increase future development rates.

The mine also delivered lower-than-expected ore throughput and ore grades in some areas, which Fresnillo is addressing by an infill drilling programme to enhance the accuracy of the geological model.

At the Saucito mine, quarterly silver production was lower as a result of lower ore grades at two high-grade stopes. An infill drilling programme is also under way to increase the accuracy of the geological model.

Edited by Creamer Media Reporter

Comments

Showroom

Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.138 0.202s - 177pq - 2rq
Subscribe Now