https://www.engineeringnews.co.za
Components|Construction|Dewatering|fittings|Installation|Nuclear|Pipes|Power|PROJECT|Service|Storage|Systems|Testing|Tubes|Waste|Water|Maintenance|Power Generation|Power-generation|Waste
Components|Construction|Dewatering|fittings|Installation|Nuclear|Pipes|Power|PROJECT|Service|Storage|Systems|Testing|Tubes|Waste|Water|Maintenance|Power Generation|Power-generation|Waste
components|construction|dewatering|fittings|installation|nuclear|pipes|power|project|service|storage|systems|testing|tubes|waste-company|water|maintenance|power-generation|power-generation-industry-term|waste

Darlington Nuclear Generating Station refurbishment project, Canada – update

Aerial image of Darlington nuclear power station

Photo by Ontario Power Generation

19th August 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Darlington Nuclear Generating Station (DNGS) refurbishment project.

Location
Ontario, Canada.

Project Owner/s
Ontario Power Generation (OPG).

Project Description
The DNGS is a four-unit nuclear power plant owned and operated by OPG.

Every unit comprises a Candu pressurised heavy water reactor with a net generating capacity of 881 MW, providing a combined capacity of 3 524 MW.

The project involves the refurbishment of each of the four DNGS reactors at the facility and continued operation of each reactor for about 30 years.

The project includes the defuelling and dewatering of the reactors; the replacement of reactor components – fuel channel assemblies and feeder pipes, repair and maintenance, as well as upgrades to the balance of plant.

The project further comprises the management of nuclear and nonnuclear waste, including storage of retube waste and transportation of miscellaneous low- and intermediate-level radioactive waste.

The reactors will also be filled with heavy water, and refuelled and restarted.

Potential Job Creation
The refurbishment will create an estimated 8 800 jobs a year during the construction period and preserve 3 000 full-time positions.

Capital Expenditure
Not stated.

Planned Start/End Date
The project is scheduled for completion in 2026.

Latest Developments
Fuel channel installation is complete on Unit 3, ending a lengthy and complex work series and resulting in the completion of the reassembly of the reactor core.

Fuel channel installation is one of the more complex steps in the project. It requires the precise installation of 480 pressure tubes, 960 end fittings and thousands of other components, OPG has said.

By incorporating lessons learned from Unit 2, the first Darlington reactor to be completely refurbished, as well as the critical retube and feeder replacement work on the Unit 3 reactor and associated systems, is progressing ahead of schedule.

With fuel channels installed and leak tight, feeder installation continues with the lower segments and connection to each channel.

The fuel load will be undertaken later this year. The remainder of the project will focus on bringing systems back into service testing and ensuring that the unit is ready to produce power for Ontario’s power grid in mid-2023, according to the OPG website.

Key Contracts, Suppliers and Consultants
GE Power (stator).

Contact Details for Project Information
OPG, email darlingtonrefurb@opg.com.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.123 0.199s - 165pq - 2rq
Subscribe Now