Cement clinker projects, Saudi Arabia

19th August 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Cement clinker projects, Saudi Arabia.

Client
Yamama Saudi Cement Company.

Project Description
The project involves the construction of two turnkey cement clinker production lines.

The two lines, with an overall capacity of 20 000 t/d of cement, will be built at a new site about 80 km east of Riyadh.

The main components include two mobile primary crushers for limestone, each with 1 800 t/h throughput; three crushers each with a 500 t/h throughput, for additives; two crushers for correctives, each with 100 t/h capacity; and two circular blending beds for limestone, each with a capacity of 80 000 t; and various additive storage facilities.

Four roller mills with a throughput of 425 t/h and two 35 000-t-capacity homogenising silos will be used to grind and store the raw material.

The kiln lines will comprise six-stage and two-string preheaters with calciner, rotary kilns with clinkering zone burners, and clinker coolers.

The clinker will be stored in three 10 000-t-capacity clinker silos and two 100 000-t-capacity clinker storage facilities.

Four combigrinding units, consisting of high-pressure grinding rolls, ball mills and separators, as well as downstream cement coolers, will each produce 300 t/h of cement.

The cement will be stored in six cement silos, each with a capacity of up to 25 000 t.

The line will also feature six cement-packing and -loading stations.

Quality control and monitoring will be handled by process control and laboratory automation systems.

Value
SR4.2-billion.

Duration
Both lines are scheduled to start operation in 2018.

Latest Developments
thyssenkrupp Industrial Solutions was awarded the engineering, procurement and construction (EPC) contract for the lump sum cement plant, including the supply of all the components for the new lines, from raw material preparation and clinker manufacture to cement loading and quality control, in November 2015.

Key Contracts and Suppliers
thyssenkrupp (EPC).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Yamama Saudi Cement Company, tel +9661 408 5600, fax +9661403 3292 or email headoffice@yamamacement.com.
thyssenKrupp Industrial Solutions communications, Torben Beckmann, tel +49 201 844 532200 or
email torben.beckmann@thyssenkrupp.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/04/2024)
12th April 2024 By: Martin Creamer
Magazine round up | 12 April 2024
Magazine round up | 12 April 2024
12th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.127 0.18s - 159pq - 2rq
Subscribe Now