https://www.engineeringnews.co.za

Atlantic Gold pushes ahead towards first production at Moose River Consolidated

Atlantic Gold is nearing the end of dry and wet commissioning of the Moose River Consolidated mine, in Nova Scotia

Atlantic Gold is nearing the end of dry and wet commissioning of the Moose River Consolidated mine, in Nova Scotia

Photo by Atlantic Gold

29th August 2017

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Vancouver-based project developer Atlantic Gold is nearing the end of dry and wet commissioning of the 87 000 oz/y Moose River Consolidated (MRC) mine, in Nova Scotia.

The TSX-V-listed emerging miner announced on Monday that commissioning activities started late in July, as originally scheduled, starting with the site being energised during the first week of July.

Construction of all surface infrastructure is substantially complete, the company advises, including the process plant and the tailings management facility.

Atlantic Gold notes that the ore stockpile pad has been prepared and that more than 1.5-million tonnes of ore is exposed in the Touquoy pit. The ore is ready for drill and blast and then haulage to the ore stockpile pad.

Commissioning of the process plant and services is progressing on plan. The crushing circuit was handed over to the Atlantic Operations team on August 24, and load tests have started. The ball mill drive has been tested and commissioned with water load test operation completed.

Meanwhile, the carbon-in-leach gold recovery tanks have all been water tested and agitators have been commissioned. A complete water loop has been completed from the ball mill, through cyclones to the leach circuit, detoxed, then recirculated by the tailings pumps to the process water tank. 

Services such as process and fresh water have been commissioned and are in service. Process water intake, the water pumping station, tailings line and the decant tower installation are expected to be fully constructed by September 3.

The process control system infrastructure installation is substantially complete with implementation of the process control system ongoing.

Atlantic Gold reported that the overall commissioning process to date has revealed no significant issues and Atlantic remains on track to produce gold in the coming weeks.

Atlantic Gold currently holds four gold development projects in Nova Scotia, including the MRC project comprising the Touquoy and the Beaver Dam gold deposits; the Cochrane Hill gold deposit, and the Fifteen Mile Stream deposit.

The Touquoy property covers an area of about 1 760 ha and Atlantic has an effective ownership interest of 63.5%, and is the project operator and manager. It will recover all operational overhead, as well as financing and sunk costs prior to any partner distributions.

Based on a 2015 feasibility study, Phase 1 economics entailed an after-tax net present value, at a 5% discount rate, of C$214-million, and an after-tax internal rate of return of 34.8%.

Production is expected at low all-in sustaining costs of $552/oz.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

Showroom

Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.092 0.149s - 156pq - 2rq
Subscribe Now