https://www.engineeringnews.co.za
Building|Construction|Energy|Engineering|Export|Gas|LNG|Marine|Power|PROJECT|Road|Storage|Systems|Water|Environmental|Operations
Building|Construction|Energy|Engineering|Export|Gas|LNG|Marine|Power|PROJECT|Road|Storage|Systems|Water|Environmental|Operations
building|construction|energy|engineering|export|gas|lng|marine|power|project|road|storage|systems|water|environmental|operations

Annova LNG Brownsville project, US

8th February 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Annova LNG Brownsville project.

Location
The project will be built at a proposed site on the Brownsville Ship Channel in Cameron County, Texas, in the US.

Client
Annova LNG.

Project Description
The project aims to build and operate a six-million-tonne-a-year liquefied natural gas (LNG) terminal to liquefy and export natural gas.

The project will include:

• pipeline meter station,

• liquefaction facilities,

• two LNG storage tanks,

• marine and LNG transfer facilities,

• two LNG storage tanks,

• a control room and administration/mainte­nance building, a site access road, and utilities (power, water, and communication systems).

Natural gas will be delivered to the project site through a nonjurisdictional intrastate, 81-cm-diameter natural gas pipeline lateral that will be built, owned, and operated by a third party.

Potential Job Creation
During construction, 700 jobs will be created and once operational, employing 165 workers.

Value
The project is expected to cost more than $3-billion.

Duration
Commercial operations are scheduled for 2024.

Latest Developments
Annova received its draft environmental-impact statement (EIS) prepared by the Federal Energy Regulatory Commission (FERC) in December 2018.

In reference to the project’s overall environmental impact, the FERC said that “with the mitigation measures recommended in the EIS and Annova’s proposed mitigation measures, impacts in the project area would be avoided or minimised and would not be significant”.

Key Contracts and Suppliers
Black & Veatch and Kiewit (engineering, procurement and construction).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Annova LNG communications, Christina Pratt, email info@annovalng.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.093 0.168s - 165pq - 2rq
Subscribe Now