Alpaslan II dam and hydroelectrıc power plant project, Turkey
Name and Location
Alpaslan II dam and hydroelectrıc power plant (HEPP) project, Turkey.
Client
EnerjiSA Enerji Uretim.
Project Description
The Alpaslan dam will be built on the Murat river and will be 116 m high and have a crest length of 800 m.
A 1 700-m-long spillway will be built to provide a safe path for floodwater to flow around the dam.
Two diversion tunnels – 875 m and 950 m long – will be built to divert the river, to allow for the construction to be done in dry conditions. These will be used as energy tunnels during operation.
Water will flow from the dam through the energy tunnels into the penstock and then to the HEPP. The water will drive the turbines located inside the HEPP to generate electricity. The HEPP will house four Francis-Vertical Axis-type turbines – two will produce 110 MW each and two will produce 30 MW each for a total capacity of 280 MW. The water will then flow back into the Murat river.
The project will be undertaken in two phases.
Value
Not stated.
Duration
Work on the dam body will start after the river diversion has taken place in May. It will take 8 to 15 months to fill the Alpaslan II dam, depending on hydrological conditions. Filling of the reservoir is likely to start in July 2015 or July 2016.
It is expected that the project will generate electricity by March 2017.
Latest Developments
The European Bank for Reconstruction and Development is considering providing a loan for the development of the project.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
EnerjiSA Enerji Uretim project office tel +90 436 711 3303.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation